Advertisement

Quick Links

UFZ
BUOY LEVEL GAUGE
UFZ 型浮标液位计
使用说明书
Operation Manual
WWW.DDTOP.COM
1 / 9

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the UFZ-4A and is the answer not in the manual?

Questions and answers

Summary of Contents for ddtop UFZ-4A

  • Page 1 BUOY LEVEL GAUGE UFZ 型浮标液位计 使用说明书 Operation Manual WWW.DDTOP.COM 1 / 9...
  • Page 2 If the instructions are not followed, the protection provided by the meter may be destroyed. Trademark, Copyright and Restriction Instructions Dandong Top Electronics Instrument (Group) Co.,Ltd.®, Dandong Top Pump Co., Ltd.®, DDTOP® are registered trademarks of the company. The performance specifications of the meter are effective as of the date of publication and are subject to change without notice.
  • Page 3: Table Of Contents

    6.2 Installation Technical Requirements ....................... 7 6.3 Installation Process-Figure 6 ..........................8 7. Fault Analysis and Elimination ..........................8 8 Disassembly ..................................9 8.1 Warning ................................... 9 8.2 Waste Removal ..............................9 9 Product Certification ..............................9 WWW.DDTOP.COM 3 / 9...
  • Page 4: Safety Tips

    1.3 Failure to Follow Safe Installation Guidelines May Result In Death or Serious Injury. The operations described in this manual are performed by professionally trained and qualified professionals or end-user specialized professionals to complete. 2. Product Manual 2.1Main Structure of Product-Figure 1 Figure 1 Main Product Structure WWW.DDTOP.COM 4 / 9...
  • Page 5: Operating Principle

    2.2 Operating Principle The UFZ-4A buoy level gauge is designed according to the principle of force balance. The working principle is shown in Figure 1. Let the weight of the float be W, the buoyancy of the float be F, the weight of the pointer weight be G, and the friction of the whole system be f.
  • Page 6: Dimensional Schematic -Figure 2

    Figure3 Sample Nameplate 5.1.2 Check the quantity of each part against the packing list and the material is correct. 5.2 Check Content 5.2.1 Check the appearance of the instrument for defects, damage and other abnormal conditions. WWW.DDTOP.COM 6 / 9...
  • Page 7: Installation

    ≤ 2°, and the bottom guiding mechanism is welded and fixed to the bottom of the tank. (Figure 5) Figure 5 Installation WWW.DDTOP.COM 7 / 9...
  • Page 8: Installation Process-Figure 6

    Cause of Issue Troubleshooting Method 1. Adjust the verticality of the 1. Wire rope installation The buoy moves up and wire rope installation. verticality is too large. down inflexibly. 2. Replace the pulley. 2. The pulley is damaged. WWW.DDTOP.COM 8 / 9...
  • Page 9: Disassembly

    Attention should be paid to hazardous process conditions, such as pressure inside the vessel, high temperatures, corrosive or toxic media, etc. 8.2 Waste Removal Waste disposal should be carried out in accordance with the current guidelines in each region. 9 Product Certification WWW.DDTOP.COM 9 / 9...

Table of Contents