Argos 01COR0808DDWW-V1 Assemble Instruction
Argos 01COR0808DDWW-V1 Assemble Instruction

Argos 01COR0808DDWW-V1 Assemble Instruction

Advertisement

Quick Links

General Instructions

01COR0808DDWW-V1
8x8 Corner shed
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied)
including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm
bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions.
For the duration of heavy or extended periods of rain, swelling of the wood panels may
occur. Warping of the wood may also occur during excessive dry spells due to an interior
moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is
suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
Our buildings are pre treated with a water based treatment**; this only helps to protect
the product during transit and for upto 3 months against mould. To validate your
guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated
with a wood preserver within the rst three months of assembly and thereafter in
accordance with the manufactures recommendations. Care must be taken to ensure
the product is placed on a suitable base.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to
diagrams for the base dimensions, The base should be slightly smaller than the external
measurement of the building, i.e. The cladding should overlap the base, creating a run
o for water. It is also recommended that the oor be at least 25mm above the
surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in
the case of childrens products independently tested to EN71 level, we cannot accept
responsibility for your safety whilst erecting or using this product.
Refer to the instructions pages for you speci c product code
Please retain product label and instructions for future reference
x2
All building's should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly, you
will need a tape measure to
check dimensions of
components.
**Protim Aquatan T5 (621)**
Your building has been treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct
application of Aquatan solution and then allowed to dry.
Aquatan is a decorative nish to colour the wood, which is applied industrially to timber fence panels and
garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl
sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
P 1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 01COR0808DDWW-V1 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Argos 01COR0808DDWW-V1

  • Page 1 Please retain product label and instructions for future reference All building’s should be Winter = High Moisture = Expansion erected by two adults Summer = Low Moisture = Contraction 01COR0808DDWW-V1 8x8 Corner shed BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY For ease of assembly, you CAUTION...
  • Page 2 01COR0808DDWW-V1 Please retain product label and instructions for future reference Overall Dimensions: Width = 2553mm Depth = 2553mm Height = 2118mm Roof support - 2705mm QTY 2 Fascia - 1258mm QTY 4 S1295-1258mm BF2770-2725mm BEVELLED Base Dimensions: Width = 2553mm...
  • Page 3 Please retain product label and instructions for future reference Pre-assembly Fix the Door trims to the Door designated as the master door with 3x30mm per trim. Pre-assembly 6x30mm screws Remove transportation blocks from the bottom of each panel before beginning assembly. Each Panel should have two.
  • Page 4 Please retain product label and instructions for future reference Step 2 Step 4 Fix the window panel and Following the same plain panel to the door panel method outlined in step 3, at each corner using 6x60mm attach the rear panel right screws as shown in the to the building using diagram.
  • Page 5 Please retain product label and instructions for future reference Step 5 Step 6 Use the Roof Support Block Locater to x the roof support block in the correct positon. As shown in the Fix the roof purlins to the front diagram position the roof support block locater ush with the top of the back corner of the building, put panels using an “L”...
  • Page 6 Please retain product label and instructions for future reference Please retain product label and instructions for future reference Step 8 Step 10 Place both of the roof sections 110cm Cut three strips from roll of felt, on top of the building, ensure 2x370cm and 1x230cm.
  • Page 7 Please retain product label and instructions for future reference Step 13 Step 11 Attach a turn button to the top Fix the cover trims to the front and botom of the slave door and side of the building using with 1x16mm black screw per 3x40mm screws per strip.
  • Page 8 Please retain product label and instructions for future reference Step 14 Fix the Door blocks (No. 16) to the back of the Doors with 2x30mm screws as shown. This will allow for 2 Turn Buttons (No. 17) It is ESSENTIAL that you apply wood to be xed to the rear one of the treatment immediately after the building has been assembled.

Table of Contents