Argos 01DDPENT1008-V2 Manual
Argos 01DDPENT1008-V2 Manual

Argos 01DDPENT1008-V2 Manual

10x8 & 12x8 pressure treated pent shed

Advertisement

Quick Links

General Instructions

10x8 & 12x8 Pressure treated pent shed
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied)
including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm
bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions.
For the duration of heavy or extended periods of rain, swelling of the wood panels may
occur. Warping of the wood may also occur during excessive dry spells due to an interior
moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is
suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
Our buildings are pre treated with a water based treatment**; this only helps to protect
the product during transit and for upto 3 months against mould. To validate your
guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated
with a wood preserver within the rst three months of assembly and thereafter in
accordance with the manufactures recommendations. Care must be taken to ensure
the product is placed on a suitable base.

BUILDING A BASE

When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
P 1
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to
diagrams for the base dimensions, The base should be slightly smaller than the external
measurement of the building, i.e. The cladding should overlap the base, creating a run
o for water. It is also recommended that the oor be at least 25mm above the
surrounding ground level to avoid ooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in
the case of childrens products independently tested to EN71 level, we cannot accept
responsibility for your safety whilst erecting or using this product.
Refer to the instructions pages for you speci c product code
Please retain product label and instructions for future reference
x2
All building's should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit

Pressure Treated Timber

Pressure treating is a chemical process which helps to protect wood against adverse weather which could
lead to rot or insect damage.
The most common chemicals used to pressure treat wood are Alkaline Copper Quaternary (ACQ),
Copper Azole (CA), and Micronized Copper Quaternary (MCQ).
Safety: Always wear gloves, eye protection and a dust mask when handling wood. Due to chemicals in
pressure treated wood, never burn its sawdust or scraps; instead dispose in a land ll.
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 01DDPENT1008-V2 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Argos 01DDPENT1008-V2

  • Page 1 General Instructions Please retain product label and instructions for future reference All building’s should be Winter = High Moisture = Expansion erected by two adults Summer = Low Moisture = Contraction 10x8 & 12x8 Pressure treated pent shed BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY CAUTION For ease of assembly, you MUST pilot drill all screw...
  • Page 2 01DDPENT1008-V2, 01DDPENT1208-V2 Please retain product label and instructions for future reference 10x8 Overall Dimensions: 12x8 Overall Dimensions: Pre Assembly Length = 3116mm Length = 3662mm Width = 2415mm Width = 2415mm Height = 2115mm Height = 2115mm Before assembling remove the transportation blocks from the bottom of each panel.
  • Page 3 Please retain product label and instructions for future reference Step 3: Window side assembly Step 5 Cut 7x (No.9) strips to 515mm and secure Following the same method outlined 4x (No.9) strips to the inside of the window in step 4, place the next 2 panels onto gap using 2x20mm screws per strip.
  • Page 4 Please retain product label and instructions for future reference Step 7 Step 9 Place a roof support bar (No. 11) Place the assembled roof panels inbetween the framing on the on to the building and secure as door side and plain side, aligning shown in the illustration with with the top of gable.
  • Page 5 Please retain product label and instructions for future reference Step 11 Step 13 Cut the felt into 3 sheets and lay Measure the gaps at the onto the roof. corners of the building & cut 6x (no.8) strips to match. * Ensure there is approximately 50mm of overhang around the Once cut secure to the...
  • Page 6 Please retain product label and instructions for future reference Please retain product label and instructions for future reference It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled. AFTER TREATMENT: score around protective cover on glazing and carefuly peel covering back...

This manual is also suitable for:

01ddpent1208-v2

Table of Contents