GE GSD1300N Installation Instructions Manual page 15

Built-in dishwasher
Hide thumbs Also See for GSD1300N:
Table of Contents

Advertisement

Dishwasher Installation
STEP 20: REPLACE ACCESS PANEL AND
TOEKICK
In this step you will need the panels and the two
screws set aside in Step 4.
There are two types of screws used. The 8-32 x 1/4"
screws are used at the top of the access panel and
should still be in place. The 10-16 x 3/8" screws are
used at the bottom of the access panel and secure
both the access panel and toekick.
IMPORTANT –
interchangeable. To prevent damage to your
dishwasher, use the proper screw in the proper
location. Do not mix screw types or lengths.
• Place the toekick against the legs of the
dishwasher.
• Remove the two 8-32 x 1/4" machine thread
screws.
• Align the access panel to the dishwasher.
• Select the two 8-32 x 1/4" machine thread screws
just removed and insert them through the top
holes in the access panel and into the dishwasher
frame.
• Tighten these screws.
• Align the toekick and make sure the bottom edge
is against the floor.
• Insert and tighten the two 10-16 x 3/8" sheet metal
thread screws, making sure the bottom edge of
the toekick stays in contact with the floor.
Remove, then Reinstall and Tighten
8-32 x 1/4"
Machine Thread Screws
A c c e ss P a n e l
o e k ic k
T
Install and Tighten
10-16 x 3/8"
Sheet Metal Thread Screws
Tip: Prevent tub damage and reduce sound from
under the dishwasher
Use the machine thread screws in the top holes and
the sheet metal thread screws in the bottom holes.
Make sure the toekick is against the floor.
Screws are not
Figure AA
STEP 21: LITERATURE
Leave the Owners' Manual, Installation
Instructions, samples, and/or coupons with
consumer.
15

Advertisement

Table of Contents
loading

Table of Contents