Site Preparation Determine the exact location where the stage will be erected. -For outdoor stages, mudsills are required to distribute the weight of 125psf on the stage legs. This will prevent the legs from sinking and ease the leveling of the stage.
Page 3
Setting the Stage -Insert legs completely into all four corner sockets on first stage section and tighten thumb screw which holds leg into deck.
Page 4
Setting the Stage continued Set first section in back left-hand corner of stage area. Note: any corner may be used as s starting point. (the first deck is referred to as the starter deck) -Align the stage section so that the connecting fingers are to the inside and the smooth sides are to the outside of the stage area.
Need help?
Do you have a question about the Signature and is the answer not in the manual?
Questions and answers