BRACES ..............8 when repairs or modifications have been made or attempted BRACING EXAMPLE LAYOUTS ......8-9 to be made by anyone other than Granite Industries. Any ROTO-LOCKS ............9 defective products that meet warranty specifications and GUARDRAIL PANEL W/ BUILT IN SOCKETS ..10 Granite Industries approval, may be returned to the factory to be repaired or replaced free of charge.
STAGE CALCULATION CHART For the required number of decks and legs needed, find the length and width on the outsie columns and record the quantities where they intersect. 4’ 8’ 12’ 16’ 20’ 24’ 28’ 32’ 36’ 40’ 44’ 48’ D = 1 D = 2 D = 3...
125 psf on the stage legs. This will prevent the legs from sinking and ease the leveling of the stage. All base pads and mudsills should only be placed on horizontal surfaces. Granite does not sell or provide mudsills or base pads. Leg Height Required 2 1/4”...
LEG ASSEMBLY Signature Staging uses an adjustable leg system, allowing you to customize your deck height. Inside Leg – 1 ½” Square Starter Leg – 1 ¾” Square The adjustable feet can add up to 2 inches of height to fine tune your deck or accommodate uneven terrain.
STAGE SETUP Signature Stages use a hanging deck system that allows you to use the adjoining decks for support, greatly reducing the number of legs required for stage setup. Each deck features two sides with hooks and two sides without hooks.
Page 7
STAGE SETUP 2nd Row: Starter Deck 2nd Row: Hanging Decks The first deck in every row is also a starting The remaining decks that follow a starting deck edge deck and will require two legs. in the second row will hang off of two adjoining decks.
BRACES Grey starter braces are for stage legs spaced 46” apart. Black continuous braces are for stage legs spaced 48” apart. Braces are required for stages over 24”. Stages over 48” need to be double braced. At least one of the braces should span the connection between 1 1/2”...
BRACING EXAMPLE LAYOUTS 40 X 24 STAGE Starter Braces: Continuous Braces: ROTO-LOCKS For further stability and security, all of our Using the 5/16” T-handle wrench (85039), decks are equipped with roto-locks, which engage the roto-locks by turning in a clockwise secure the stage decks together and lock them direction.
GUARDRAIL PANEL WITH BUILT IN SOCKETS Guardrail is optional on decks below 30” in height, but required for anything 30” and above. 3/8” x 1”L Bolt 3/8” x 3”L Bolt Align the guard rail with the stage deck. Note the Use a 3/8”...
Page 11
GUARDRAIL PANEL WITH BUILT IN SOCKETS 4’x4’ Signature Stage Deck with Closeup of guardrail attached to stage decks. 4’ Half Vertical Guardrail Panel Closeup of guardrail attached to stage corner.