PPA BARRIER BRC Technical Manual
PPA BARRIER BRC Technical Manual

PPA BARRIER BRC Technical Manual

Advertisement

Quick Links

Made by: Motoppar Indústria e Comércio de Automatizadores Ltda
Av. Dr. Labieno da Costa Machado, 3526 - Distrito Industrial - Garça - SP - CEP 17406-200 - Brasil
CNPJ: 52.605.821/0001-55
www.ppa.com.br | +55 14 3407 1000
BARRIER BRC
JETFLEX BRUSHLESS
WARNING:
Do not use the device
without referring to this
manual first.
P09754 - 09/2021
Rev. 0
Technical Manual

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BARRIER BRC and is the answer not in the manual?

Questions and answers

Summary of Contents for PPA BARRIER BRC

  • Page 1 Made by: Motoppar Indústria e Comércio de Automatizadores Ltda without referring to this Av. Dr. Labieno da Costa Machado, 3526 - Distrito Industrial - Garça - SP - CEP 17406-200 - Brasil manual first. CNPJ: 52.605.821/0001-55 www.ppa.com.br | +55 14 3407 1000 P09754 - 09/2021 Rev. 0...
  • Page 2 INSTALLATION SITE The driveway where the automatic barrier (boom gate) will be installed must be previously analyzed, by checking the entire infrastructure of the place, the floor conditions, the electrical network, the width of the passage span, the height of the clearance (if any), the flow of vehicles and the need to use CONTENTS optional accessories.
  • Page 3 2. Provide the routing of the power cables and pushbuttons through this Barrera Barrier BRC (Brazo / Mástil articulable) piping to the place where the equipment will be operated. Refer to the table below for choosing the proper cable, according to the NBR 5410...
  • Page 4 EQUIPMENT DIMENSIONS Ceiling )Extra space) 300mm Useful Length = Beam length - 280mm )In order to mount it, take this measurement out) 280mm )Beam length) Base of the barrier )Free span) CONSTRUCTION OF THE BASE FOR ANCHORING THE CUBICLE Build a concrete plinth, so that the highlighted orientation (Ex: “400” - 'Barrier' Automatic Barrier) is located towards the curb (street, traffic lane), following the suggested dimensions.
  • Page 5 Note: The anchor bolts must not be inserted completely, they must remain INSTALLING THE AUTOMATIC BARRIER about 15mm (0.6 in) out of the concrete plinth. 1. When anchoring the cubicle, note that its inspection door must face the side of the track or traffic lane. INSPECTION DOOR 5.
  • Page 6 7. Insert the washers and nuts for the definitive mounting of the cubicle. 10. Power / energize the barrier according to the voltage of the purchased product (127V or 220V). WASHERS AND NUTS Note: Use 2.50mm² cables. Use a dedicated circuit breaker, i.e., a circuit breaker to which only the barrier will be connected.
  • Page 7 13. The automatic barrier will be in good opening condition, when the beam / boom is in the condition shown in the image below. Spring Bolt Chain Chain Stretchers ADJUSTING THE MAGNET BARS With the beam properly balanced, and with its opening and closing 'mechanical stoppers' adjusted, check if it is necessary to adjust the magnet bars.
  • Page 8 Note: In the first activation, the beam will move slowly in an opening and closing movement, as it will be reading the path. Right after the reading is done, its operation is right, and the automatic barrier starts to operate at the factory default speed.

Table of Contents