Page 1
2 LARGE SOLAR PATHWAY LIGHTS model no. 24141 Assembly Instructions IMPORTANT: Please read this manual carefully before beginning assembly of this product. Keep this manual for future reference. Overview This product is designed to the highest technical specifications and standards. It will supply years of maintenance-free use.
Page 2
24141 Getting Started Please do not throw away any packing material until all parts are verified as present. Features Included In Box (2) solar lights and instructions Runtime Up to 8 hours LEDs 1 warm white SMD LED in each light...
Page 3
24141 Assembly & Operation For First Time Use: Step 1: Insert Pole (C) over base of Lens (B) until secure. Step 2: Remove pre-installed Ground Spike (D) from base of Pole (C). Insert base of Ground Spike (D) so that spiked end now faces downward.
Page 4
1-Year Limited Product Warranty This product is covered under a one year limited warranty. Fusion Products Ltd. warrants to the original purchaser that this product is free from defects in materials and workmanship for the period of one year from date of purchase.
Need help?
Do you have a question about the 24141 and is the answer not in the manual?
Questions and answers