  • Page 1 Alliance 4-Door/Elevator Controller DGP Installation Manual...
  • Page 2 Copyright © 2012 UTC Fire & Security Americas Corporation, Inc. Interlogix is part of UTC Climate Controls & Security, a unit of United Technologies Corporation. All rights reserved. This document may not be copied or otherwise reproduced, in whole or in part, except as specifically permitted under US and international copyright law, without the prior written consent from UTC Fire &...
  • Page 3 2. Term. This Agreement is effective until terminated. You may terminate this Agreement by uninstalling all components of the Software from all Computing Devices and returning the Licensed Product to UTC FIRE & SECURITY. UTC FIRE & SECURITY may terminate this Agreement if You breach any of these terms and conditions.
  • Page 4 Alliance 4-Door/Elevator Controller DGP Installation Manual Restricted rights legend. The Licensed Product is provided with RESTRICTED RIGHTS. In the event the United States Government or an agency thereof is granted a license, the following additional terms apply: Restricted Computer Software, as defined in the Commercial Computer Software–Restricted Rights clause at Federal Acquisition Regulations 52.227-19, and the restrictions as provided in subparagraphs (c)(1) and (c)(2) thereof;...
  • Page 5: Table Of Contents

    Contents Preface .............
  • Page 6 Alliance 4-Door/Elevator Controller DGP Installation Manual...
  • Page 7: Preface

    Preface This is the Alliance 4-Door/Elevator Controller DGP Installation Manual for door controller models AL- 1255 and AL-1256 and elevator controller model AL-1265. This document includes an overview of the product and detailed instructions explaining: • how to install; and •...
  • Page 8 viii Alliance 4-Door/Elevator Controller DGP Installation Manual...
  • Page 9: Product Overview

    Product overview The Alliance 4-door and 4-elevator controller DGP devices extend the system’s access control functions. The devices allow up to four readers per door/elevator and add intelligence to the doors/elevators while increasing the total number of doors in the system. AL-1255.
  • Page 10: Installation

    Alliance 4-Door/Elevator Controller DGP Installation Manual Installation To install the DGP, do the following: 1. Mount the enclosure. A suitable location includes easy access for wiring, good lighting, suitable access to power and earth ground, and ample space to work. The mounting surface should be flat and dry. We do not recommend mounting metal enclosures directly onto concrete walls.
  • Page 11 2. Install the standoffs. Before you install the DGP board, configure the appropriate standoffs. Use male/ female standoffs where threaded holes are aligned with the mounting holes on the board and use clip- in standoffs where square holes are aligned with the mounting holes (Figure 2) Figure 2.
  • Page 12 Alliance 4-Door/Elevator Controller DGP Installation Manual 6. Slide the DGP board’s terminal blocks together as shown in Figure 3 and mount them to the board. Figure 3. Terminal block assembly 7. Use four 6/32 x 1/4 in. screws with internal star washers to mount the board (Figure 4) in the enclosure (Figure 2 on page 3).
  • Page 13: Leds

    LEDs Figure 4 on page 4 shows the following LEDs located on the DGP board: RX0. Flashing LED indicates polling data is being received from the control panel on the system bus. TX0 (OK). Flashing LED indicates the DGP is replying to polling from the control panel on the system bus.
  • Page 14: Wiring

    Alliance 4-Door/Elevator Controller DGP Installation Manual Wiring The DGP must be wired to both the system bus and the DGP local bus. Note: FCC requires that shield cables must be used (Belsen 8723 or equivalent). System bus connections Keep all panel wiring well away from other wiring. Avoid parallel wire runs with other wires. Where parallel wire are unavoidable, keep wires a minimum of 2 in.
  • Page 15 System bus connections Connect DGP devices to the system bus to provide extra zones and remote arming stations (RAS) to the Alliance system control panel. Remote devices can be up to 5,000 ft. (1.5 km) from an Alliance system control panel.
  • Page 16 Alliance 4-Door/Elevator Controller DGP Installation Manual Shielded cable routing Cnnect the shielding of all shielded cables used in the system at one side to one common earthing point in a building. If a shielded bus cable is routed via more than one plastic device, you must connect the shielding from in-coming and out-going cable (Figure 7).
  • Page 17: Dgp Connections

    DGP connections Keep nonpower-limited wiring away (1/4 in. minimum) from power-limited wiring (Figure 9). Disconnect the AC power via a dedicated circuit breaker before servicing. Figure 9. Power and nonpower wiring Nonpower- limited wiring Nonpower- limited wiring Power- limited wiring Power- limited wiring...
  • Page 18 Alliance 4-Door/Elevator Controller DGP Installation Manual Wiring connections Figure 10 shows the wiring connections on the DGP board. See on page 16 for the Battery capacity appropriate battery type. The total auxiliary power out is 1 Amp for the AL-1255 and 3 Amps for the AL-1256 and AL-1265 including unlock relays and door/elevator controller outputs.
  • Page 19 Figure 11 shows details of a typical magnetic door lock wiring configuration. Figure 11. Typical magnetic door lock Door lock Door diode lock...
  • Page 20 Alliance 4-Door/Elevator Controller DGP Installation Manual Alarm input and bell output connections Figure 12 shows alarm inputs and bell output (dry contacts) wiring connections. Figure 12. Alarm input and bell output wiring Alarm inputs Bell output NO C NC 1 C 2 C 5 C 6 C 7 C 8 C 9 C 10 C 11 C 12 C 13 C 14 C 15 C 16 C...
  • Page 21 Card reader connections Figure 14 shows how to wire the DGP to an AL-1191/1193 card reader. You can connect the violet wire (open collector) to a zone via an EOL (end-of-line) resistor. Figure 14. AL-1191/AL-1193 Card reader wiring Black Green AL-1191/AL-1193 White card reader...
  • Page 22 Alliance 4-Door/Elevator Controller DGP Installation Manual Local bus connections You can connect up to 16 arming stations (LCD-RAS, Smart Card readers) to the J22 Comms local bus (Figure 4 on page 4). Wire the door contacts and request-to-exit buttons associated with each door to the controller DGP inputs (Figure 16).
  • Page 23: Programming Options

    Programming options The DGP provides the following programming options: 1. DGP options 2. Door options Access Request-to-exit Alarm control Reader Hardware Elevator 3. Initialize database 4. Display card 5. Door groups 6. Floor groups 7. System options 8. Program macro logic 9.
  • Page 24: Battery Capacity

    Alliance 4-Door/Elevator Controller DGP Installation Manual Battery capacity You must do the battery capacity calculations separately for each part of the system that has a separate power supply and standby battery. See on page 18 for a sample worksheet. To Battery calculation worksheet determine the correct battery capacities for you system, do the following: 1.
  • Page 25 4. Do the following calculations for each worksheet: Formula 1. Transfer the total value at the bottom of the Total standby current column to the first blank in Formula 1. Enter the required number of hours in standby in the corresponding blank, and do the indicated calculation.
  • Page 26: Battery Calculation Worksheet

    Alliance 4-Door/Elevator Controller DGP Installation Manual Battery calculation worksheet Table 3. Battery calculation worksheet Alliance Standby Total standby Alarm current Total alarm Total active components current current per device current Active current current AL-4017 200 mA Aux power 300 mA Ext siren 1000 mA Int siren...
  • Page 27: Formulas

    Formulas Table 4 provides the formulas to calculate battery requirements. Table 4. Battery calculation formulas Formula Calculation Result Total standby current x Conversion factor x Required hours in standby Ah standby Amp-hours .001Amp/mA hours Ah alarm Amp-hours Total alarm current x Conversion factor x Required minutes in alarm x Conversion factor .001Amp/mA minutes x .0167 hours/min.
  • Page 28: Specifications

    Alliance 4-Door/Elevator Controller DGP Installation Manual Specifications General specifications Batteries 2 x 12 VDC 17.2 Ah, depending on current consumption auxiliary devices Current consumption PCB 275 mA max. Total external current AL-1255 1 A max. to all external devices AL-1256/AL-1265 3 A max to all external devices End-of-line resistors Default: 4.7 k ohm (other: 10 kohm, 6.8 kohm, 5.6 kohm, 3.74 kohm, 3.3 kohm, 2.2 kohm,...
  • Page 29: External Terminals

    External terminals Part Terminal Description Min. Unit Secondary AC transformer connection AL-1255 AL-1256/65 BATT 17.4 Two connections (rating for each connection) Auxiliary power outputs (combined loads) 13.8 AUX, POWER + +, - AL-1255 AL-1256/65 Switch power outputs 13.8 Siren output 13.8 When using speaker J4 to J17 RELAY...
  • Page 30: Contacting Technical Support

    Alliance 4-Door/Elevator Controller DGP Installation Manual Contacting technical support For assistance installing, operating, maintaining, and troubleshooting this product, refer to this document and any other documentation provided. If you still have questions, you may contact technical support during normal business hours (Monday through Friday, excluding holidays, between 6 a.m. and 5 p.m. Pacific Time). Table 6.
  • Page 32 Alliance 4-Door/Elevator Controller DGP Installation Manual...

This manual is also suitable for:

Interlogix al-1256Interlogix al-1265