SETUP Set up, installation, deflation and handling should be done by a QUALIFIED ATTENDANT ONLY. The inflatable may weigh over 200 lbs. Caution should be exercised when lifting and handling the equipment. Use a dolly to move the equipment. 1. DO NOT set up when windy and or it rains. 2.
Page 3
45 angle with the head pointing away from the Ninja Jump unit. Secure the Ninja Jump unit at all times to the corresponding number of anchors. Use the straps to attach the anchors to all the double-loops as provided in specific areas on the base of the Ninja Jump unit.
Page 4
Let both air tubes lie parallel to each other so the air can escape freely. 3. As the Ninja Jump unit deflates, arrange the columns to fall on top of the base making sure that the deflated unit is evenly spread out.
MAINTENANCE PROCEDURES t • 1. It is good practice to clean the Ninja Jump unit after each use. 2. Use mild dish-washing liquid and clean rags for general clean-up, preferably while the Ninja Jump unit is inflated.