Important: Select the input cable specification according to the maximum current of
E
the charging station used minimum 2.5mm² cable is required for 16A charging station.
3. Reattach the cover of the protection box (Figure 8).
Figure 7: Details on the cabling at the entrance terminal from the charging station.

6.3 STEP 3: WALLMOUNTING

Embed STATION into MOUNTING PLATE on the wall.

6.4 STEP 4: FIX THE CABLE HANG

Fix the cable hanger on the right place you want.
18
Figure. 8 Fixed terminal cover
Installation guide