7. TEST PROCEDURES AND TROUBLESHOOTING
7. TEST PROCEDURES AND TROUBLESHOOTING
7. TEST PROCEDURES AND TROUBLESHOOTING
7. TEST PROCEDURES AND TROUBLESHOOTING
7. TEST PROCEDURES AND TROUBLESHOOTING

CAUTION

CAUTION
CAUTION
CAUTION
CAUTION
‑ DISCONNECT THE POWER SUPPLY CORD FROM THE WALL
‑ DISCONNECT THE POWER SUPPLY CORD FROM THE WALL
‑ DISCONNECT THE POWER SUPPLY CORD FROM THE WALL
‑ DISCONNECT THE POWER SUPPLY CORD FROM THE WALL
‑ DISCONNECT THE POWER SUPPLY CORD FROM THE WALL
  OUTLET WHENEVER RMOVING THE CABINET FROM THE
  OUTLET WHENEVER RMOVING THE CABINET FROM THE
  OUTLET WHENEVER RMOVING THE CABINET FROM THE
  OUTLET WHENEVER RMOVING THE CABINET FROM THE
  OUTLET WHENEVER RMOVING THE CABINET FROM THE
  UNIT.
  UNIT.
  UNIT.
  UNIT.
  UNIT.
  PROCEED WITH TESTS ONLY AFTER DISCHARGING THE
  PROCEED WITH TESTS ONLY AFTER DISCHARGING THE
  PROCEED WITH TESTS ONLY AFTER DISCHARGING THE
  PROCEED WITH TESTS ONLY AFTER DISCHARGING THE
  PROCEED WITH TESTS ONLY AFTER DISCHARGING THE
  HIGH VOLTAGE CAPACITOR AND REMOVING THE LEAD
  HIGH VOLTAGE CAPACITOR AND REMOVING THE LEAD
  HIGH VOLTAGE CAPACITOR AND REMOVING THE LEAD
  HIGH VOLTAGE CAPACITOR AND REMOVING THE LEAD
  HIGH VOLTAGE CAPACITOR AND REMOVING THE LEAD
  WIRES ON THE PRIMARY WINDING OF THE HIGH VOL‑
  WIRES ON THE PRIMARY WINDING OF THE HIGH VOL‑
  WIRES ON THE PRIMARY WINDING OF THE HIGH VOL‑
  WIRES ON THE PRIMARY WINDING OF THE HIGH VOL‑
  WIRES ON THE PRIMARY WINDING OF THE HIGH VOL‑
  TAGE TRANSFORMER.(SEE FIGURE 3)
  TAGE TRANSFORMER.(SEE FIGURE 3)
  TAGE TRANSFORMER.(SEE FIGURE 3)
  TAGE TRANSFORMER.(SEE FIGURE 3)
  TAGE TRANSFORMER.(SEE FIGURE 3)
Primary
Winding
A. TEST PROCEDURES
A. TEST PROCEDURES
A. TEST PROCEDURES
A. TEST PROCEDURES
A. TEST PROCEDURES
COMPONENT
COMPONENT
COMPONENT
COMPONENT
COMPONENT
MAGNETRON
MAGNETRON
MAGNETRON
MAGNETRON
MAGNETRON
Secondary
Winding
CHECKOUT PROCEDURE
CHECKOUT PROCEDURE
CHECKOUT PROCEDURE
CHECKOUT PROCEDURE
CHECKOUT PROCEDURE
1) Check for resistance: Across the filament
terminal of the magnetron with an ohm.
2) Check for resistance: Across the filament
terminal of the magnetron and the chassis
ground with an ohm meter on highest scale.
Filament
Winding
Figure 3
Figure 4
Figure 5
‑ 5 ‑
RESULT
RESULT
RESULT
RESULT
RESULT
Normal reading:
Less than 1 ohm.
Normal reading:
Infinite ohms.