Repair and maintenance work on the drill shall only be performed by qualified personnel,
specifically trained on this equipment.
5.1
After operations
Plug hydraulic hoses to prevent hydraulic leaks and dirt to enter the hydraulic system.
Clean the tool with fresh water. Apply an anti-corrosive layer on the tool when it is clean,
WD40 or similar.
Check hydraulic hoses, bolts, etc.
Check the drill bit for damage.
When stored make sure the cylinders is fully retracted, to avoid corrosion.
Place tool in a proper storage box or room.
5.2
Periodic maintenance
Start with "After operations" maintenance procedure.
A careful review of the entire tool is mandatory. This includes a visual check of the tool with
hoses and a function test. Be sure that there is no leaks and that the feeding rate is correct.
Replace or fix parts if needed. Damaged paint must be repainted.
Issue date:
2014.12.29
Rev.no:
002
Owner:
IKM Administrator
Company:
IKM Technique AS
Page 12 of 23