Operating conditions
Installation Location
Operating Temperature
Operating Temperature
(Recommended)
Storage Temperature
Humidity
Altitude
Cooling
Reliability and certification
Certificates (cell)
Certificates (battery module) IEC62619 / UL1973
Transportation
Ingress rating
4. INSTALLATION
4.1 Installation tools
Item
Description
Marking pen
Impact drill ( 12 mm)
Steel tape
Torque wrench (Opening size:13mm)
Phillips-screwdriver (M6,M8)
Straight screwdriver
Hexagon wrench
AEG LOW VOLTAGE ENERGY STORAGE UNIT (8 KWH / 12 KWH) INSTALLATION MANUAL
Indoor
[°C]
-10~45
[°C]
15~30
[°C]
-20 ~60
[%]
5~95
[m]
Max. 2000
Natural
convection
UL1642
UN38.3
IP20
Item
Description
Crimping tool
Wire cutters
Wire strippers
Multimeter
Safety (insulated) gloves
Safety goggles
Dust mask
Safety shoes
Note: For specific requirements such as the
narrowest maintenance channel, escape route,
etc., please refer to the applicable standards of
the country/ region where the project is located.
Use properly insulated tools to prevent accidental
electric shock or short circuits.
4.2 Installation materials
The below installation material should be arranged by
the installer for the installation of the battery pack:
•
Charging cables
•
Network cable
4.3 Wire specifications
Energy storage system:
In order to standardize the specifications of AC and DC
connectors or terminals of the compatible inverters,
please make sure to follow the below requirements for
13
EN
PD202107 V1-21