Download Print this page

Advertisement

Quick Links

CANYON 2 TIER SHOE CABINET ASSEMBLY INSTRUCTIONS
Thank you for purchasing the Canyon Shoe Cabinet.
Please read the instructions carefully to ensure safe operation of this product.
PLEASE READ this sheet prior to assembly to familiarise yourself with the various stages of construction.
Carefully open the pack supplied and check the contents against the parts and fittings check list. Do not
destroy any of the packaging until you are certain that you have all the necessary parts for the assembly.
CAUTION: There are small components used in the construction of this unit. These loose items should be
kept away from young children whilst assembling your unit to avoid the danger of choking.
Tools Required
Size:
81 x 24 x 108 cm (WDH)
Dark Oak
Colour:
Version 1 - 210821
PO No:
Page 1 of 18
1
Hour
1/4
Set Up

Advertisement

loading

Summary of Contents for Canyon 2 TIER SHOE CABINET

  • Page 1 CANYON 2 TIER SHOE CABINET ASSEMBLY INSTRUCTIONS Thank you for purchasing the Canyon Shoe Cabinet. Please read the instructions carefully to ensure safe operation of this product. Size: 81 x 24 x 108 cm (WDH) Dark Oak Colour: PLEASE READ this sheet prior to assembly to familiarise yourself with the various stages of construction.
  • Page 2: Care Information

    CANYON 2 TIER SHOE CABINET ASSEMBLY INSTRUCTIONS IMPORTANT - READ CAREFULLY - RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE. INFORMATION This product is designed to hold 12Kg in total, spread evenly over the whole unit. Do not exceed this weight. We recommend that this unit is assembled in the room intended for use.
  • Page 3 CANYON 2 TIER SHOE CABINET ASSEMBLY INSTRUCTIONS Parts and Fittings Checklist Please check the pack contents before assembling the product. If any components are missing, please contact your retailer. The fittings pack contains small items that should be kept away from children.
  • Page 4 CANYON 2 TIER SHOE CABINET ASSEMBLY INSTRUCTIONS All parts are packed in one carton Description: Top Panel Description: LH Side Panel Description: RH Side Panel Qty: 1 Qty: 1 Qty: 1 Size: 810 x 240 x 15 mm Size: 1035 x 223 x 15 mm...
  • Page 5 CANYON 2 TIER SHOE CABINET ASSEMBLY INSTRUCTIONS Fittings (to scale) Code Item Quantity Long Cam Bolt (38mm overall) Large Cam Lock Dowel (8x30mm) Short Cam Bolt (25mm overall) Small Cam Lock Connection Bolt (M6x25mm) Screw for Fitting Drawer Stop (N)
  • Page 6 CANYON 2 TIER SHOE CABINET ASSEMBLY INSTRUCTIONS Fittings (not to scale) Code Item Quantity Allen Key (4mm) Drawer Stop Shoe Carriage Swivel - Left Hand Shoe Carriage Swivel - Right Hand Shoe Carriage Stop Shoe Carriage Swivel Pivot Pin Swivel Pivot Bush for...
  • Page 7 CANYON 2 TIER SHOE CABINET ASSEMBLY INSTRUCTIONS STEP 1 For this step: Tools required Fittings required Align the parts (R) & (T) then carefully tap into place L x1 using a light hammer. R x4 T x4 U x1 STEP 2...
  • Page 8 CANYON 2 TIER SHOE CABINET ASSEMBLY INSTRUCTIONS STEP 3 For this step: Tools required Fittings required K x4 STEP 4 For this step: Tools required Fittings required K x4 Version 1 - 210821 Page 8 of 18...
  • Page 9 CANYON 2 TIER SHOE CABINET ASSEMBLY INSTRUCTIONS STEP 5 For this step: Tools required Fittings required A x10 B x6 C x4 STEP 6 For this step: Tools required Fittings required B x4 Version 1 - 210821 Page 9 of 18...
  • Page 10 CANYON 2 TIER SHOE CABINET ASSEMBLY INSTRUCTIONS STEP 7 For this step: Tools required Fittings required V x2 STEP 8 For this step: Tools required Fittings required A x8 B x2 C x2 Version 1 - 210821 Page 10 of 18...
  • Page 11 CANYON 2 TIER SHOE CABINET ASSEMBLY INSTRUCTIONS STEP 9 For this step: Tools required Fittings required F x4 STEP 10 For this step: Tools required Fittings required K x4 Version 1 - 210821 Page 11 of 18...
  • Page 12 CANYON 2 TIER SHOE CABINET ASSEMBLY INSTRUCTIONS STEP 11 For this step: Tools required Fittings required iii. D x4 E x4 K x4 STEP 12 For this step: Tools required Fittings required Version 1 - 210821 Page 12 of 18...
  • Page 13 CANYON 2 TIER SHOE CABINET ASSEMBLY INSTRUCTIONS STEP 13 For this step: Tools required Fittings required G x2 N x2 STEP 14 For this step: Tools required Fittings required B x6 C x2 Version 1 - 210821 Page 13 of 18...
  • Page 14 CANYON 2 TIER SHOE CABINET ASSEMBLY INSTRUCTIONS STEP 15 For this step: Tools required Fittings required STEP 16 For this step: Tools required Fittings required G x6 Version 1 - 210821 Page 14 of 18...
  • Page 15 CANYON 2 TIER SHOE CABINET ASSEMBLY INSTRUCTIONS STEP 17 For this step: Warning: Tools required Always ensure the area to be drilled is In the final position the cabinet is to be free from hidden electrical wires, used place it flat against the wall.
  • Page 16 CANYON 2 TIER SHOE CABINET ASSEMBLY INSTRUCTIONS STEP 19 LOOSELY FIT THE SWIVELS (P&Q) For this step: x2 SETS TO EACH SIDE OF THE FLAP (22) USING Tools required SCREWS (H). DO NOT TIGHTEN SCREWS 100% YET. GENTLY LEAN SWIVELS (P&Q) OUTWARDS Fittings required AND SLIDE THE BASE (23) INTO THE GUIDES.
  • Page 17 CANYON 2 TIER SHOE CABINET ASSEMBLY INSTRUCTIONS STEP 21 For this step: Tools required Fittings required SLIDE CENTRAL PARTITIONS (24) INTO THE SWIVEL GUIDES. STEP 22 For this step: Tools required CLAMP CENTRAL PARTITIONS (24) IN PLACE USING SCREWS (H).
  • Page 18 CANYON 2 TIER SHOE CABINET ASSEMBLY INSTRUCTIONS Assembly Completed Your Canyon Shoe Cabinet is now completely asse mbled. Periodically check to ensure that the components are in their proper position, free from damage. Also, make sure the connectors are tight and secure.