Drawell DW-LBI Series Instruction

Drawell DW-LBI Series Instruction

Biochemical incubator

Advertisement

Quick Links

Please read operating manual before installation and operation.
Drawell International Technology Limited
Chongqing Drawell Instrument Co., Ltd.
Shanghai Drawell Scientific Instrument Co.,Ltd.
Chongqing Center : Suite 2705,Building No.12,Shiyou Road No.1, Yuzhong District,
Chongqing, China.
Shanghai Office : Suite 1117,Lane561 XiuChuan Rd.,PuDong New
Area,Shanghai,China
Homepage : www.drawell.com.cn
Tel : 0086-023-63268643
Email : sales05@drawell.com.cn
DW-LBI Series
Biochemical Incubator
(Instruction)
.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DW-LBI Series and is the answer not in the manual?

Questions and answers

Summary of Contents for Drawell DW-LBI Series

  • Page 1 Biochemical Incubator (Instruction) Please read operating manual before installation and operation. Drawell International Technology Limited Chongqing Drawell Instrument Co., Ltd. Shanghai Drawell Scientific Instrument Co.,Ltd. Chongqing Center : Suite 2705,Building No.12,Shiyou Road No.1, Yuzhong District, Chongqing, China. Shanghai Office : Suite 1117,Lane561 XiuChuan Rd.,PuDong New Area,Shanghai,China Homepage : www.drawell.com.cn...
  • Page 2: Table Of Contents

    Contents I: Precautions ……………………………………………...1 II: Application……………………………………………………..1 III: Technical Specifications……………………………………..2 IV: Installation requirements………………………....2 V: Operation Instruction………………………………………….3 VI: Wiring diagram..............6 VII: Malfunction handling………………………......7 VIII: Transportation and storage………………………………...7 IX: After-sales service…………………………………………..7 X: Packing List……………………………………….…………….8...
  • Page 3: I: Precautions

    Thanks for purchasing the equipment, please carefully read the manual before operating. I. Precautions When no lighting is needed in the chamber, please turn off the light so as not to affect the temperature of the upper layer. Turn off the power supply before changing the light tube.
  • Page 4: Iv: Installation Requirements

    Model DW-LBI- DW-LBI-150 DW-LBI-200 DW-LBI-250 DW-LBI-300 DW-LBI-400 Chamber Volume 150L 200L 250L 300L 400L 0~60 ℃ Temperature Range 0.1 ℃ Display Resolution ±1℃ Temperature Stability ±1℃ Temperature Uniformity Timing Range 0~9999min Power Rating(W) Refrigerant R134a Power Supply 220V , 50Hz Continuous Operation Long continuous operation Chamber...
  • Page 5 Panel: 2) Controller instructions: (1) Cycles: display the number of cycles when it is a program segment;; (2) Program segments: display the number of segments in program mode; (3) Appointment time indicator: it lights when the appointment is turned on; (4) Time: program segment time or fixed value timing time;...
  • Page 6 disinfection. E: Illumination key: Press to start or stop the illumination. Parameter specifications: 1. In the standard state, long press the SET button, the upper row on screen displays LK, adjust LK=8, press the SET button to enter setting Factory set Symbol Item Value...
  • Page 7 Factory Symbol Item Value Description set value 0 means no alarm, 1 menas lower Setting deviation alarm. When value temperature less than -50. ~ lower (temperature set value-AL)℃, the 6.0℃ 100.0℃ deviation refrigeration will be turned off. The alarm abnormal indicator lights up and the buzzer sounds.
  • Page 8: Vi: Wiring Diagram

    In the vicinity of the set temperature, Full when there is a deviation in the adjustment temperature, value (-19~2000) adjusted Pk=4000×[mercury reading temperature value-current measurement value] ÷ (Slope) current measurement value. Ambient cb = actual ambient temp.-currently temperature -60.~100.0 measured ambient temp. correction Temp.
  • Page 9: Viii: Transportation And Storage

    Problems Causes Solution Socket without power Change socket Not plugged or wire broken Plug well or connect wire well No power supply Fuse is open Change fuse Power switch not on Switch on. Setting temperature is wrong Adjust setting temperature The temperature controller is broken Change the temperature controller The temperature does not...
  • Page 10 1 Set Biochemical incubator Machine User Manual Document 1 Copy Fuse Spare parts This packing list Document 1 pc We reserve the right to change the data in the manual without prior notice. The company has the final interpretation right.
  • Page 11 Drawell International Technology Limited Chongqing Drawell Instrument CO,.Ltd Add:Suite 2705,Building No.12,Shiyou Road No.1,Yuzhong District, Chongqing,China Tel: 0086-023-63268643 Shanghai Drawell Scientific Instrument Co.,Ltd Add : Suite 1117,Lane561 XiuChuan Rd.,PuDong New Area,Shanghai,China Web : www.drawell.com.cn Email : sales05@drawell.com.cn...

Table of Contents