Download Print this page

babcockdavis Lume-A-Lit BEM-SNE Installation, Operation And Maintenance Manual page 2

Nyc compliant not an exit sign

Advertisement

INSTALLATION
1. Thoroughly clean the surface area where the sign will be installed with a dry cloth and a
non-residue cleaning compound to remove and loose particles and dirt. For oily surfaces,
isopropyl alcohol works well for surface preparation. Seal porous surfaces if needed and
repair cracks or damaged areas. Surfaces must be dry and dust free.
2. Measure to determine proper location of the sign.
3. The sign can be attached with the included adhesive tabs, appropriate construction
adhesive applied to the back of the sign or with a mechanical fastener using the pre-drilled
holes in each corner of the sign.
4. When using the adhesive pads, peel the pad from the liner being careful not to touch the
adhesive. Place the pads evenly to the back of the sign and press firmly into place. After the
pads have been adhered to the back of the sign, remove the other liner from all the tabs,
again being careful not to touch the adhesives. Place the sign in its appropriate location and
press firmly to attach to the substrate. When using construction adhesive to attach the sign,
follow the instruction provided by the manufacturer of the adhesive. When using
mechanical fasteners to attach the sign be sure to use the proper type and length for the
substrate.
OPERATION
o Exposure Requirements: The minimum amount of exposure to artificial ambient
illumination is 60 minutes from the following:
One-foot candle (11 Lux) of florescent, incandescent, or LED light
o The control of the ambient illumination necessary to charge the luminous egress-path-
marking system should be restricted to authorized personnel only.
o Failure to supply the above minimum exposure can prevent the luminous egress-path-
marking from performing as intended.
o No specific building surface treatment is required for the luminous egress-path-marking
system to function properly.
o Reliable external illumination is always required during building occupancy.
Installation, Operation & Maintenance
Model(s): BEM-SNE
©2020 Babcock-Davis, Inc.
Luminous Egress
2
Rev 8/2020

Advertisement

loading