lilitab Floor Pro Assembly Instructions Manual

lilitab Floor Pro Assembly Instructions Manual

Hide thumbs Also See for Floor Pro:

Advertisement

Lilitab Floor Pro Mount
Assembly Instructions
v4.0

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Floor Pro and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for lilitab Floor Pro

  • Page 1 Lilitab Floor Pro Mount Assembly Instructions v4.0...
  • Page 2 Bolt Down Installation ........6 Scan to watch assembly video! GOT QUESTIONS? WE’RE HERE TO HELP! EMAIL support@lilitab.com PHONE 888.705.0190 Lilitab Floor Pro Mount Assembly Instructions v4.0...
  • Page 3 INCLUDED IF YOU ORDERED FLOOR BASE Kensington compatible cable lock 1 x Floor Base 1 x Base Housing 2 x M6x12mm Base Screws (short) 2 x M6x14mm Base Screws (long) 2 x M3x6mm Base Security Screws Lilitab Floor Pro Mount Assembly Instructions v4.0...
  • Page 4 BASE HOUSING FOR TABLET’S AC ADAPTER Included with optional floor base 2 X M4 ACCESSORY MOUNT POINTS Accepts Backdrop Graphic FLOOR BASE Optional LOCK POINT Accepts kensington lock Lilitab Floor Pro Mount Assembly Instructions v4.0...
  • Page 5 The Lilitab Pro is designed to be operated with the lock closed. NOTE: You will need to hold the base housing up Refer to your Lilitab Head Unit owner’s...
  • Page 6 ~12" PIGTAIL Power supply cable can run under or on top of floor. 4X M6 OR The Lilitab Floor Pro can be mounted 1.50 directly to any hard floor surface using 1/4-20 2 x bolts, wood screws or other fastener 38.10...

Table of Contents