Getting To Know Your Package Protector™ PORT Before the assembly process begins, please review the illustration below The major components that you will be working with are identified So, as you are installing your Package Protector™ PORT you will be familiar with terms that are used in this guide 17 3/4”...
Hardware and Component List The cabinet and pedestal are packaged separately Below is a list of components and hardware you will receive in each package • Pedestal ` Pedestal ` Template—guide to locate pedestal base anchors ` Rubber Pad—to be installed between concrete foundation and pedestal base •...
Foundation Requirements The Package Protector™ PORT may be installed on an existing concrete pad/foundation at least 4” thick If you are pouring new concrete, the following foundation is TABLE 1 required: WIDTH x DEPTH • Pier concrete foundation 12” x 18” x 24” deep THICKNESS (minimum size) •...
Check for Level (refer to FIGURE 1) Place rubber pad over anchors onto concrete pad Before attaching the pedestal to the FIGURE 1 cabinet, set the pedestal in place over anchor the rubber pad and check if level Note: If the pedestal is not level, anchor adjustment must be made washer...
Once the pedestal is in all the way (flush against the bottom of the cabinet), push the pedestal down until it FIGURE 4 locks into place When the two (2) alignment holes are in full view above the pedestal, it is locked in the proper alignment position (FIGURE 4) holes...