Florence versatile 4C Depot Installation Manual

Stand-alone cabinet

Advertisement

Quick Links

INSTALLATION MANUAL
versatile™ 4C Depot
Stand-alone Cabinet

Advertisement

Table of Contents
loading

Summary of Contents for Florence versatile 4C Depot

  • Page 1 INSTALLATION MANUAL versatile™ 4C Depot Stand-alone Cabinet...
  • Page 2: Table Of Contents

    Lay boxes flat. Do not stand on end as box could fall over and cause injury. CAUTION -- Installation • Florence 4C units are heavy. Do not stand 4C units up without support to prevent tipping. • Pinch hazard exists when placing cabinets next to each other. Keep fingers and hands clear to avoid injury.
  • Page 3: Depot Overview

    4C DEPOT OVERVIEW • The 4C Depot consists of a stand-alone cabinet with a 4C mailbox installed. • 4C Depot cabinets are of aluminum construction with a durable powdercoat finish on all exposed exterior surfaces. • Each Depot cabinet has four (4) adjustable leveling feet for installation on uneven surfaces. •...
  • Page 4: Suggested Tools

    SUGGESTED TOOLS Unloading/Unwrapping: General: • Tin snips • Gloves • Dolly • Safety glasses • Straps • Steel toed shoes • Shop vacuum Basic Installation: • Broom • 2-ft level • Waterbased cleaner, such as “Simple • Hammer drill Green™” ` 7/16”...
  • Page 5: Unpack The 4C Depot

    UNPACK THE 4C DEPOT IMPORTANT NOTE: When accepting the shipment from the carrier, inspect, and make note of, and/or photograph, any noticeable damage that may have occurred during shipment. Report any damage found to the freight company. If you have purchased a 4C Depot free-standing cabinet with no 4C mailbox installed, go to “APPENDIX A: INSTALLING 4C MAILBOX INTO DEPOT CABINET”...
  • Page 6: Preparation And Initial Placement

    PREPARATION AND INITIAL PLACEMENT 1  . Place the 4C cabinet in the desired installation location. 2  . Remove the lower-front panel from the cabinet. • Use the #2 square-tip 1/4” hex-shank insert driver bit supplied in the package of hardware, placed into a cordless driver, to remove the two (2) screws from the panel.
  • Page 7 3  . Remove and discard the plastic push-in rivets which hold the two mounting brackets and two skirt plates in place inside the lower compartment of the 4C Depot cabinet. temporary plastic rivets 4  . Remove the two mounting brackets and two skirt plates from the cabinet, and set them aside for later installation.
  • Page 8 6  . Tighten the jam nuts on all four (4) of the leveling bolts with a 9/16” wrench to lock the leveling bolts in their leveled position. jam nuts 7  . Install the two (2) mounting brackets and two (2) skirt plates back inside the lower compartment of the 4C Depot cabinet.
  • Page 9 D. Secure each mounting bracket to the Front skirt plate removed cabinet structural tube using six (6) 10-32 x for illustration clarity 1/2” self-tapping Phillips-head screws (206727). self-tapping screws Front skirt plate in place www.florencemailboxes.com 4C Depot Installation Manual—206731—Rev C Page 9 of 16...
  • Page 10: Anchor The 4C Depot To Concrete

    ANCHOR THE 4C DEPOT TO CONCRETE 1  . With a hammer drill and 7/16” masonry bit, drill holes through the anchor holes in each end of the mounting brackets to a depth of 4 inches into the concrete. • If you successfully drill all four anchor holes to full depth, go to Step 6.
  • Page 11: Finish Installation

    FINISH INSTALLATION 1  . Insert the top of the lower-front panel into the gap behind the lower 4C mailbox trim and push the bottom of the panel against the cabinet. 2  . Secure the lower-front panel to the cabinet using a #2 square-tip 1/4” hex-shank insert driver bit and the two (2) screws removed at the start of the installation.
  • Page 12: Appendix A: Installing 4C Mailbox Into Depot Cabinet

    APPENDIX A: INSTALLING 4C MAILBOX INTO DEPOT CABINET CAUTION • Florence 4C units are heavy. Use caution when lifting and carrying to avoid injury. • Pinch hazard exists when placing mailbox units into Depot cabinets. Keep fingers and hands clear to avoid injury.
  • Page 13 Insert the 4C mailbox module into the front opening of the 4C Depot cabinet, taking care not to damage the mailbox or the cabinet. 7  . For Double-Wide Florence 4C Modules: A. Open the right master door until the hold- open arm engages and install the included 8-18 x 1 1/4”...
  • Page 14 If overtightening occurs, simply back out each overtightened mounting screw. 8  . For Single-Wide Florence 4C Modules: A. Open the master door until the hold-open arm engages. B. Install the included 8-18 x 1 1/4” pan-head T20 Torx screws (65734) along both the left- and right-hand outer frame.
  • Page 15 This page intentionally left blank. www.florencemailboxes.com 4C Depot Installation Manual—206731—Rev C Page 15 of 16...
  • Page 16 Florence Corporation is part of the Gibraltar Industries family of companies. www.gibraltar1.com...

Table of Contents