Download Print this page

Bourgault 7000 Series Start-Up Checklist page 3

Air seeders
Hide thumbs Also See for 7000 Series:

Advertisement

Steps:
(note underlined sections below are links to online resources.)
1.
Remove wing pins and unfold the drill. Return wing-lift remote to "neutral" position after drill
is fully unfolded;
2.
Set-up desired
and job
(more
3.
Select a field,
create a "Job"
4.
Enable tanks that are to be used, or disable tanks that are not to be used, next run
Optimizer" to determine the most acres-per-fill for your product mix, or manually enter
products in each tank (Bourgault recommends "Tank Optimizer").
the correct "Boom" (Seed or
tank accordingly;
5.
Enter the Bourgault recommended
Reference Card" (seed, fert., in-tank);
6.
In the settings page,
7.
If applicable,
connect the "Xtend app"
8.
Engage both fan hydraulics;
9.
Fill tank via auger/conveyor using the remote
Wizard" if applicable, or use the remote to enter weights manually (if desired);
10.
Calibrate the tanks;
11.
Replace the drop tubes into the correct air streams. Ensure that the tank lids are closed. If
two or more tanks are combined, ensure that the downspouts are in the same line;
12.
Ensure everyone is clear of the drill. Engage the opener circuit. Raise and lower the
openers using the 410/415 box or the X30/35 Apollo System. Ensure
down" on the 410/415 box, or that the green is down if using LiftMaster.
NOTE: the "ASC" button may need to be "off" to raise and lower the openers.
Time" in X30/35 if
13.
Calibrate PackMaster
PackMaster are entered. (more info available in
14.
Lower the
openers. Check the LiftMaster and the TrackMaster settings (if enabled);
15.
Check the inner wing down pressure, run at the lowest settings unless conditions warrant
additional wing pressure (very hard/dry);
16.
Check MRB &
Hi-Flotation pressure
17.
Set the fan speed
StartupChecklist_24March2020.docx
Quick Start options
in the settings menu, then use Quick Start to load a field
info). If not using Quick Start, manually select a field and create a job;
(this will already be done if using "Quick Start");
Fertilizer). Open or close Inter-connect ports in the Air Seeder
(more
info)
"ASC Granular Product
program desired keypad buttons
Video Link – Step
necessary;
(if enabled). Once complete,
gauges;
using the
Bourgault fan speed charts
7000 Series Air Seeders / 3320 PHD / 3720 ICD
Timings" from the "Quick
for in-cab and tank keypads.
to your tablet/smartphone;
(learn the remote if
1;
Video Link – Step 2
ensure the desired downforce
Bourgault X35 (3 of 4) - Additional
(unloaded graph lines at this point);
3
"Tank
Ensure each tank is set to
necessary). Use
"Tank Fill
"up is up, down is
Adjust "Lower
(lbs) for
Features)
2020-03-24

Advertisement

loading

This manual is also suitable for:

3320 phd3720 icd