Download Print this page
Riverside Furniture 10277 Assembly Instructions

Riverside Furniture 10277 Assembly Instructions

Queen sleigh uph. bed

Advertisement

Quick Links

Riverside
email: info@riverside-furniture.com
H-A
Allen Head Bolt
H-D
8 pcs.
ASSEMBLY STEPS :
1. Place the Headboard Panel (H-A) face down on a clean and soft surface.
2. Attach the Left and Right Headboard Posts (H-B) to the back of the Headboard Panel,
(H-D). Do not fully tighten until after next step. (see Detail A).
3. Attach the Headboard Stretcher (H-C) to the Headboard Posts using the same Washers
4. Tighten all Bolts using the Allen Wrench (H-G). (see Detail A & B).
5. Gently lean the back of the assembled Headboard against the wall where the Bed will be
located in the room.
Huntleigh # 10277
Queen Sleigh Uph. Bed
FURNITURE
Assembly Instructions
H-B
Spring Washer
H-E
H-C
Flat Washer
8 pcs.
H-F
Page 1 of 2
Made in Viet Nam
8 pcs.
H-G
H-F
H-D
H-E
H-G
H-F
H-D
H-E
H-G
4mm
Allen Wrench
1 pc.

Advertisement

loading

Summary of Contents for Riverside Furniture 10277

  • Page 1 Page 1 of 2 Huntleigh # 10277 Riverside Made in Viet Nam Queen Sleigh Uph. Bed FURNITURE Assembly Instructions email: info@riverside-furniture.com Allen Head Bolt Spring Washer Flat Washer Allen Wrench 8 pcs. 8 pcs. 8 pcs. 1 pc. ASSEMBLY STEPS : 1.
  • Page 2 CUSTOMER TO PROVIDE 5/16 X 3-1/2" LONG BOLTS, NUTS & WASHERS TO CONNECT THE METAL BED FRAME 5/0 Queen Standard Bed 10277 -- 4/6-5/0 Sleigh Headboard 10279 -- 4/6-5/0 Sleigh Footboard w/Slats 10274 -- 5/0-6/6 Sleigh Bed Rails The Headboard may be used alone...