1.
Health and Safety
1.1
Only competent personnel may carry out the work outlined within this document.
1.2
The wearing of appropriate Personal Protective Equipment (gloves, footwear, safety glasses etc.) is
required for safe working and as the site dictates.
1.3
Dampers may be heavy. Large dampers will require suitable lifting and supporting equipment, with
due consideration given for manual handling.
1.4
Dampers may close without warning. Do not introduce limbs/fingers between blades whilst the
actuator is fitted.
1.5
Where dampers are only accessible with the need for additional elevation, any equipment used
should be done so with due consideration to the Work at Height regulations 2005 and current site
rules.
1.6
All work should be carried out in accordance with HSE guidelines and regulations and any specific
local site rules.
2.
Important
2.1
These instructions should be read in its entirety before commencing work. The installer must be
Competent with the manufacturer's fire barrier separating element construction.
2.2
Actuators are IP54 rated – Check actuator connection box is suitably located.
2.3
Do not cut/shorten the Thermal Fuse lead (-TF Actuators). This will render the unit inoperable and
invalidate the warranty.
2.4
Where an actuator is supplied with a Thermal Fuse (TF), the TF MUST be fitted in accordance with
Section 15. Failure to meet this requirement will invalidate the warranty and the damper will fail to
respond as designed/tested.
2.5
All Fire / Smoke Damper installations must be installed to a BSB tested method and carried out to
the satisfaction of the appropriate Building Control officer and/or specifying authority.
Fig. 1
Page 1

Advertisement

loading

Summary of Contents for Maico BSB FSD-TD Series

  • Page 1 FSD-TD Series Fig. 1 Installation, Operation and Maintenance Instructions These instructions must be left with the damper M A N U F A C T U R E R S O F A I R , F I R E A N D S M O K E P R O D U C T S FSD-TD Fire and Smoke Damper Health and Safety Only competent personnel may carry out the work outlined within this document.
  • Page 2: Equipment Required

    FSD-TD - Installation Operation and Maintenance Instructions Important continued Refer to actuator label for wiring of actuator and page 12. Refer to section 19 for testing. Complete Installation Check List (at end of this document) and retain for future reference. For existing dry walls –...
  • Page 3 FSD-TD - Installation Operation and Maintenance Instructions Dry Wall Preparation - Fig.2 Preferably, prepare the opening whilst building the fire separation barrier, or cut opening if barrier already exists. (see 2.8) (CL) Cleated and Frameless Installations 5.2.1 The finished aperture size to be nominal duct width +160mm and nominal duct height +100mm.
  • Page 4 FSD-TD - Installation Operation and Maintenance Instructions Dry Wall – (AF) EASY FIX® Angle Frame Installation – Fig. 3 Drill out the inner row of 2mm diameter angle frame pilot holes to 4mm diameter. Position the damper centrally in wall opening (width/height), with blades running horizontally. Using the inner row of pilot holes, screw the EASY FIX®...
  • Page 5 FSD-TD - Installation Operation and Maintenance Instructions Masonry Wall – (AF) EASY FIX® Angle Frame Installation – Fig. 4 Preferably, prepare the opening whilst building the wall, or cut an opening if the wall already exists. The damper is not load-bearing and additional support for the top of the wall opening is achieved by means of a lintel or other approved method.
  • Page 6 FSD-TD - Installation Operation and Maintenance Instructions Masonry Wall – (AF) EASY FIX® Angle Frame Installation – Fig. 4 continued Fig. 4 Page 6...
  • Page 7 FSD-TD - Installation Operation and Maintenance Instructions Concrete Floor – (AF) EASY FIX® Angle Frame Installation – Fig. 5 Preferably, the opening would have already been formed. If not, cut an opening in the floor ensuring that the correct finished size is achieved. Mark out the position and size of the required cut size on the floor.
  • Page 8 FSD-TD - Installation Operation and Maintenance Instructions (HF) HEVAC Frame Installation (wall and floor) Procedure - Figs. 6-8 Preferably, prepare opening whilst building the wall/floor (or cut an opening if the wall/floor already exists). Finished sizes should be 50mm min to 100mm max > HEVAC frame assembly extremities. The damper is not load-bearing and additional support for the top of the wall opening is achieved by means of a lintel or other approved method.
  • Page 9 FSD-TD - Installation Operation and Maintenance Instructions (HF) HEVAC Frame Installation (wall and floor) Procedure - Figs. 6-8 continued Fig. 8 (Wall) Page 9...
  • Page 10 FSD-TD - Installation Operation and Maintenance Instructions Rockwool Ablative Batt Penetration Seal - Fig. 9 10.1 Prepare the Dry Line Wall section as shown. Two layers of fire board either side of the metal track forming the aperture and line with a single layer of fire board. 10.2 Using threaded drop rods of the correct length affixed to the underside of the slab/soffit, pass the other end through the damper cleat hole to provide support prior to fitting the fire batt into position.
  • Page 11 FSD-TD - Installation Operation and Maintenance Instructions {SA) Sleeve and Angle Installation Procedure - Fig. 11 11.1 This installation method is suitable for all wall structures (the installation shown here is in a dry wall for information purposes). 11.2 If need be, to ease connection to ductwork, connect stub duct(s) to damper spigot(s) before positioning damper in wall opening.
  • Page 12 FSD-TD - Installation Operation and Maintenance Instructions {SA) Sleeve and Angle Installation Procedure - Fig. 11 continued 11.7 By using appropriate means, make and finish hole in wall. Ensure both surfaces of wall around perimeter of opening are flat and smooth to allow angle to be fitted without gaps in excess of 2mm. 11.8 Position and temporarily support damper centrally in wall opening.
  • Page 13 FSD-TD - Installation Operation and Maintenance Instructions Dry wall - (CL) Cleated Installation Procedure - Fig. 12 continued Fig. 12 Page 13...
  • Page 14 FSD-TD - Installation Operation and Maintenance Instructions Dry wall - Frameless Installation Procedure – Fig. 13 13.1 This is similar to Cleated installation. Refer to section 12 for this recommended detail. Also, refer to section 5 for wall preparation instructions. 13.2 Depending on wall thickness, it may ease connection of ductwork, if connecting ductwork is attached to damper prior to fitting pattress around damper.
  • Page 15 FSD-TD - Installation Operation and Maintenance Instructions Actuator General Information 14.1 Actuators are fitted to the 12mm A/F square shaft on the Transfer Drive (TD) box. 14.2 Check that the actuator, thermal fuses (where present) and wires are undamaged. 14.3 Check the actuator label to for correct voltage and operation as below: •...
  • Page 16 FSD-TD - Installation Operation and Maintenance Instructions 18 Removing/replacing or repositioning the FSD-TD actuator - Fig. 1 18.1 Ensure that the power has been isolated from the actuator and that the damper is now in the failsafe position, this would normally be with the blades in the closed position. 18.2 Using the 8mm spanner, undo the centre-bolt anti-clockwise and remove along with the washer keeping safe and close to hand.
  • Page 17: Fault Finding

    FSD-TD - Installation Operation and Maintenance Instructions Routine Inspection. Testing and Maintenance - continued 19.12 Open the damper using a 12mm A/F spanner on the TD box. Check for foreign items in and around blades, paying particular attention to blade fishtails. Remove any obstructions.
  • Page 18: Electrical Connections

    FSD-TD - Installation Operation and Maintenance Instructions Commissioning 22.1 The damper cannot be commissioned unless it is fully installed and connected to mains power in compliance with regulations. 22.2 Dampers should be fully inspected and checked in accordance with the inspection handover check sheet prior to the dampers and panel being commissioned.
  • Page 19 FSD-TD - Inspection and handover check sheet Project Name: This check sheet only applies to the BSB Fire and Fire/Smoke dampers. The installer should complete this handover check sheet to ensure installation is in accordance with BSB installation guides and is compliant before handover. Question Guidelines Confirmed...
  • Page 20 For purchase orders and order related enquiries, please email: orders@bsb-dampers.co.uk For pricing, technical and general enquiries, please email: enquiries@bsb-dampers.co.uk Website: www.bsb-dampers.co.uk • A member of the Maico group BSB Engineering Services Ltd. reserves the right to modify or withdraw any specification without prior notice that may result from continuous product development.

This manual is also suitable for:

Bsb fsd-td s c1 b1 hf pm230-tf