13-2. MUZ-LN50VG
OPERATING PROCEDURE
1. Removing the cabinet
(1) Remove the screws of the service panel.
(2) Remove the screws of the top panel.
(3) Remove the screw of the valve cover.
(4) Remove the service panel.
(5) Remove the top panel.
(6) Remove the valve cover.
(7) Disconnect the power supply and indoor/outdoor connect-
ing wire and the demand control signal transmission cable.
(8) Remove the screws of the cabinet.
(9) Remove the cabinet.
(10) Remove the screws of the back panel.
(11) Remove the back panel.
Photo 2
Screws of the top panel
Screws of
the cabinet
Screw of
the valve cover
Screws of
the service panel
OBH767
Screw of the back panel
Screws of
the cabinet
Screws of
the back panel
NOTE: Turn OFF the power supply before disassembly.
Photo 1
Screws of the top panel
Screws of
the cabinet
58
PHOTOS
Screws of
the cabinet