12. Link the other tracks to the Standard-Length Track in the following
order: 1/3 Length Bulge Track, 90-Degree Bulge Track, two 1/3
Length Bulge Tracks, 90-Degree Bulge Track.
13. Use the Slide Track to link the SmartPoint
second level with the 90 Degree Bulge Track on the first level.
14. Insert the Rotary Sign into the top of the Left Castle Support.
15. Attach the Gate Arm to the right side of the SmartPoint
Track. A click sound will indicate the pieces are secure.
Main Track to the
®
Main
®
12