I.
SP200 Checklist
a. Variable Speed Portable Sample Pump
b. 15' pickup hose
c. 10' Battery Cable (Inside Enclosure)
d. SP200 Manual
e. 12 volt battery (Not included)
II.
Inspection
a. Your SP200 unit was carefully inspected and certified by our Quality
Assurance Team before shipping. If any damage has occurred during
shipping, please notify Global Water Instrumentation, Inc. and file a
claim with the carrier involved.
Use the checklist to ensure that you have received everything needed
to operate the SP200.
Global Water
800-876-1172 • globalw.com
- 3 -