Extreme Networks PowerDrive Orbit Quick Operation Manual page 7

Table of Contents

Advertisement

PowerDrive Orbit & X6
PDCU-xx Tool Configuration Report
7
8
9
10
11
12
13
7. Tool Firmware Version – The tool firmware version is entered into the downlink timing sheet
because different versions have different downlinks available.
8. Downlink Bit Period – The bit period the tool is initially configured to accept. Remember, the tool
will always accept 60 second bit period regardless of whether it's in 18 or 36 second mode.
9. Desired Steering Mode – If PowerV, a specific downlink sequence must be sent to "unlock" the tool
and allow deviation from vertical. See section 3.8 for more details.
10. Desired Toolface – Initial Toolface setting. Typically, 0 or 180.
11. Desired Steering Ratio – Initial Steering Ratio. Typically, 0% (neutral) or 100% (PowerV Lock).
12. Desired Toolface Mode – Initial Toolface mode. Typically, Gravity.
Extreme Equipment Rentals
Quick Operations Guide - rev1.4
Page 7 of 35

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

X6

Table of Contents