Download Print this page
Billi 420 Installation Manual

Billi 420 Installation Manual

Tower dispenser
Hide thumbs Also See for 420:

Advertisement

Installation guide
Billi Quadra Firewall
Tower dispenser
1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 420 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Billi 420

  • Page 1 Installation guide Billi Quadra Firewall Tower dispenser...
  • Page 2: Table Of Contents

    Installation guide Billi Quadra – Firewall Tower Contents Installation Requirements Quadra ……………..….……………….…………………………………………………………..3-4 Installing the Dispenser Firewall Tower ………………………………………………………………………………………….5 Installing the Underbench Module Quadra …………………......................6-7 Commissioning Quadra ……………………………………………………………………………………………..8-9...
  • Page 3: Quadra

    Installation guide Billi Quadra – Firewall Tower Installation Requirements – Quadra Components for Billi Quadra Compact, 420, 440, 460, 4100 & 4180 Models Before commencing installation, ensure you have the following: 1. Underbench module 2. Dispenser with tubing 3. Tube spring clamps x 3 4.
  • Page 4 Installation guide Billi Quadra – Firewall Tower Drainage Water-cooled Quadra models require a drainage point such as a dishwasher nipple. Use the nipple adaptor fitting supplied or the clamp-on drain adaptor (both supplied with system). Clamp-on drain adaptor must be installed above the water seal on the sink side of the water trap. Diagram 4...
  • Page 5: Installing The Dispenser

    Installation guide Billi Quadra – Firewall Tower Installing the Dispenser IMPORTANT: This Billi appliance is to be installed by a licensed trades person in accordance with AS/NZS 3500.1 and AS/NZ 3500.2 and in compliance with applicable state regulatory requirements. For correct operation of this appliance, it is essential to observe the manufacturer’s instructions.
  • Page 6: Installing The Underbench Module

    Installation guide Billi Quadra – Firewall Tower Installing the Underbench Module – Quadra 1. Flush Water Supply Flush water supply pipework before installing the underbench unit by connecting 600mm flexible braided hose to the supply tap and running water into a bucket. Blockages/unit malfunction caused by debris are not covered under warranty.
  • Page 7 Installation guide Billi Quadra – Firewall Tower Diagram 10 Diagram Diagram 11 Diagram Diagram 12 Diagram...
  • Page 8: Quadra

    Installation guide Billi Quadra – Firewall Tower Commissioning – Quadra Setting the Programs The Quadra operational settings have been Turn On the Water Supply factory set for a typical installation. Clock is set Turn on the water supply tap and ensure that to Eastern Standard Time (EST).
  • Page 9 Installation guide Billi Quadra – Firewall Tower Boiling water flow rate WARNINGS. The boiling water flow rate can be adjusted to suit the installation or user preference. For continued safety of this appliance it Extended tube lengths will require the pump must be installed, operated and maintained in accordance with the manufacturer’s speed to be increased.
  • Page 11 44mm (UK) 50mm 64mm (UK)
  • Page 12 Billi Pty Ltd As Billi Pty Ltd has a policy of 42 Lucknow Crescent, Thomastown continual improvement, all details are Victoria 3074 Australia subject to change without notice. All goods are sold subject to our published Telephone +61 3 9469 0400 terms and conditions.