Page 2
Longitudinal Channelizing Device (LCD) Deployment 1. Determine the deployment location of 2001MB and follow the instructions of the highway authority or project manager (if available). 2. Deploy the barricades, empty, in line with each other and join each unit to the next using an Interlocking Coupler.
Page 3
2001MB Removal 1. Loosen Fill Caps to facilitate water removal. 2. Remove the Drain Plug at the base of the barricade and drain water completely. 3. After the barricade is empty, attach Drain Plug, Fill Cap, and remove Interlocking Coupler. 4.
Page 4
Perimeter Security with Fence Panel Deployment (Not MASH Tested) Warning: The 2001MB with Fence Panels should only be deployed on level ground. 1. Position each 2001MB in line with the next using Interlocking Couplers. 2. If a connection is required to make a corner, use the 2001MB Corner Connector and join it to the adjacent 2001MB Barricade run using an Interlocking Coupler (p.
Page 5
Perimeter Security with Fence Panel Removal 1. Remove privacy, wind or debris screens (if attached). 2. Remove Fence Panel Clamps. 3. With the assistance of an additional person or persons (as needed), lift the Fence Panel out of the barricade and place on the ground. Remove and retain each Rubber Grommet. 4.
Need help?
Do you have a question about the Yodock 2001MB and is the answer not in the manual?
Questions and answers