Summary of Contents for Trinity Highway QuadGuard Elite M10 Wide
Page 2
® illustrations, and specifications are based on the latest QuadGuard Elite M10 information Wide available to Trinity Highway at publication. We reserve the right to make changes at any time. Please visit TrinityHighway.com/Product/QuadGuard-Elite-M10/ to confirm the latest revision. ® Part No. 626821 QuadGuard is a registered trademark of Energy Absorption Systems, Inc.
Customer Service Contacts Trinity Highway is committed to the highest level of customer service. Feedback regarding the ® QuadGuard Elite M10 system, its assembly procedures, supporting documentation, and Wide performance is always welcome. Additional information can be obtained from the contact...
® experienced in the assembly, maintenance, or repair of the QuadGuard Elite M10 Wide. Additional copies of this manual are available from Trinity Highway by calling (888) 323-6374 or by visiting TrinityHighway.com/Product/QuadGuard-Elite-M10/. Please contact Trinity Highway if ® you have any questions concerning the information in this manual or about the QuadGuard Elite M10 Wide.
Features”, Trinity Highway contracts with FHWA approved testing facilities to perform and evaluate crash tests to prepare a crash test results report. Trinity Highway is then able to submit a Request for Federal Aid Reimbursement of Safety Hardware Devices to the FHWA for review.
Quad-Beam Panels. Important: Trinity Highway makes no recommendation whether use or reuse of any part of the system is appropriate or acceptable following an impact. It is the sole responsibility of the project engineer and/or the local highway authority and its engineers to make that determination. It is critical that you inspect this product after assembly is complete to make certain that the instructions provided in this manual have been strictly followed.
Below is a list of system components that may be used in your particular QuadGuard Elite M10 Wide configuration. Verify parts delivered and system details with the BOM (Bill of Materials) and system drawings shipped with your system. Please call Trinity Highway if you have any system questions (p. 3). Note: Components are not shown to scale.
Page 9
Monorail, One Bay, QG Monorail, Three Bays, QG End Cap, Monorail, QG 611370 611379 608136 Flt St 3/16X2X13, W/ Holes Die Spring, 1 1/2 ODX3/4X6 Mushroom Washer 618652 117458 617045 Clamp, Nose Belt Nose Cylinder Plate 606330 612253 Belt Nose Assy QGE, 69 Nose Belt Hit Indicator Assembly 618870...
Adhesive, HY200, Hilti Anchor Kit, Hilti 3/4X7 Tel 2X2X12GA, H2S, G, 10” 118710 619316 615765 Select Transition Important: A proper Transition Panel or Side Panel must be used on each side of the Backup. A Side Panel is not needed when a Transition Panel is used. ®...
Recommended dimension and reinforcement specifications for new concrete foundations are provided in Trinity Highway Concrete Foundation drawing, supplied with the system. The system may be assembled on a non-reinforced concrete roadway (minimum 8” [203 mm] thick). Assembly cross-slope shall not exceed 8% and should not twist more than 2% over the length of the system;...
Foundation/Anchoring Warning: It is the responsibility of the local DOT or appropriate highway authority to ensure that this assembly conforms to the AASHTO Roadside Design Guide. Warning: It is the responsibility of the installer to ensure that your assembly procedure meets all appropriate Occupational Safety and Health Administration (“OSHA”) and local standards.
Trinity Highway Approved Adhesive Anchoring System A Trinity Highway approved adhesive anchoring system is required to securely anchor crash cushions. Each approved adhesive kit contains adhesive, studs, nuts and washers. Both vertical and horizontal assemblies are possible using an approved adhesive anchoring system.
4) Apply Approved Adhesive Fill the borehole 100% full. Caution: Fill borehole 100% full so it is even with the pavement surface per the adhesive manufacturer’s instructions. 5) Add the Washers and Nuts Place a flat washer onto the stud then thread a nut on until the end of the stud is flush with the nut (Figure 8).
Horizontal Anchors The horizontal approved adhesive kit is the same as the vertical kit. Caution: Fill borehole 100% full so it is even with the vertical concrete surface per manufacturer’s instructions. 1) Follow the instructions supplied with your approved adhesive kit Apply approved adhesive to each anchor per instructions.
Page 20
BACK FRONT Figure 10 Plan View Figure 11 Elevation View 1) Backup Quad-Beam Fender Panel 3) Belt Nose 4) Cylinder 5) Diaphragm 6) Monorail 7) Hit Indicator TrinityHighway.com Revision A August 2020...
Page 21
How to Determine Left/Right To determine left from right when ordering parts, stand in front of the system facing the hazard. Your left is the system’s left and your right is the system’s right. Right Left Figure 12 Left/Right Counting the Number of Bays One Bay consists of one Diaphragm, two Fender Panels, etc.
® QuadGuard Elite M10 System Chart Width 8 Bay - 62 mph [100 kph] 69” [1,753 mm] QM10069E The nominal width of the Tension Strut Backup is the width between Side panels behind the Backup (Figure 14). The outside width of the system is approximately 6” [152 mm] to 9” [229 mm] wider than this measurement.
Page 23
Figure 16 Tension Strut Backup A. Locate the centerline of the system by measuring the proper offset from the hazard. See the drawing package supplied with the system. B. Mark the centerline of the system with a chalk line. C. Mark a construction line parallel to the center line and offset 6.5” [165 mm] to one side as shown in Figure 17.
Page 24
2) Anchor the Backup and Monorail See Figure 18 (showing Backup Assembly) and Figure 20 (showing Monorail deployment). Also refer to the drawing package and the approved anchoring instructions (p. 16). Warning: Location of the system is critical and dependent on the type of Transition Panel used.
Page 25
ANCHOR CAUTION: 1 1/2” [38 mm] MAXIMUM STUD HEIGHT WASHER BACKUP OR MONORAIL ROADWAY Figure 19 Proper Stud Height 4” [100 mm] TENSION STRUT BACKUP 3/4X7 STUD CENTERLINE CONSTRUCTION LINE CONCRETE PAD MONORAIL Figure 20 Backup and Monorail Placement for Tension Strut Backup Top surfaces must be flush...
Page 26
3) Attach Side Panels / Transition Panels to Backup Assembly Attach the Transition Panel or Side Panel as appropriate to each side of the Backup. Refer to Figure 22 and the drawing package for more information. Note: A Side Panel is not needed when a Transition Panel is used. Figure 22 Side Panel/Transition Panel Attachment TrinityHighway.com...
Page 27
4) Attach Monorail Guides Attach Monorail Guides to Diaphragms as shown in Figure 23, and the Diaphragm Assembly drawing (p. 49). DIAPHRAGM MONORAIL GUIDE 3/4 LOCK WASHER 3/4X2 G8 HEX BOLT 3/4 HEX NUT Figure 23 Monorail Guide Attachment One Side TrinityHighway.com Revision A August 2020...
Page 28
5) Deploy Diaphragms Orient a Diaphragm so that the front face of the Quad-Beam shape faces toward the Nose of the system as shown in Figure 24. Slide one Diaphragm all the way to the Backup to ensure the system is able to collapse properly during impact. Once this has been verified, slide the Diaphragm forward to approximately 32”...
Page 29
7) Cylinder Attachment ® All QuadGuard Elite M10 Wide systems utilize three Cylinder types. Bay 1 contains a Cylinder with ME1 stenciled on the outer surface. The Nose Assembly contains a single walled 28” outside diameter Cylinder with QEN stenciled on the surface. All remaining Bays have Cylinders with ME2 or ME3 stenciled on the outer surface.
Page 30
9) Attach Remaining ME3 Cylinders Continue attaching the ME3 Cylinders to Diaphragms using 3/4X9” hex bolts, hex nuts and bar washers. Remove any clearance between the ME3 Cylinders and Diaphragms as you work forward from the Backup. Tighten all fasteners. Important: Diaphragm Extensions must be in place before Cylinder attachment.
Page 31
11) Attach the ME1 Cylinder in Bay 1 3/16X2X13 FLT ST W/HOLES ME2 CYLINDER ASSEMBLY 3/4 HEX NUT DIAPHRAGM EXTENSION ME1 CYLINDER ASSEMBLY 3/16X2X13 FLT ST W/HOLES 3/4X9 HEX BOLT Figure 29 Typical ME1 to ME2 Mounting TrinityHighway.com Revision A August 2020...
Page 32
12) Attach Nose Cylinder Attach the Nose Cylinder using two 5/8” bolts rods through the Nose Cylinder Plate, Nose Cylinder, and Diaphragm (Figure 30). Secure each 5/8” hex bolt with flat washers, lock washers, and hex nuts. Tighten all fasteners. 5/8X9 HEX BOLT 5/8X1 3/4 WASHER DIAPHRAGM EXTENSION...
Page 33
14) Fender Panel Attachment Starting at the Backup and working forward, assemble Left and Right Fender Panels as shown in Figure 34. Step 1. Place the Fender Panel so that the center hole of the rearward Diaphragm is lined up with the approximate center of the slot in the Fender Panel. Attach the Mushroom Washer Assembly as shown in Figure 35 but do not torque at this time.
Page 34
Note: Mushroom Washers lay flat against the Fender Panel as shown below. Mushroom Washer Stand-off must be seated completely through slot (Figure 35). STAND-OFF FENDER PANEL MUSHROOM WASHER CORRECT INCORRECT Figure 35 Continue attaching Fender Panels until you reach Diaphragm No. 1 (Figure 36). DIAPHRAGM #1 Figure 36 Diaphragm No.
Page 35
The Nose can be delineated to comply with local codes (chevron, reflectorized sign, etc.). Warning: Placing the wrong type Cylinder in the Nose or any Bay will result in unacceptable crash performance as described in MASH. 5/8X5 G5 HEX BOLT WASHER TO BE FLUSH WITH FENDER PANEL HUMPS HINGE PLATE...
Page 36
16) Attach Hit Indicator to Diaphragm No. 1 The Hit Indicator should be the last component attached to the system. Fasten the Hit Indicator to the first Diaphragm as shown in Figure 39. Offset component to right side of Diaphragm. Step 1.
Page 37
17) Checking The System Assembly At this point tighten all Mushroom Washer Assembly nuts until they bottom out on the threads of screws and recheck to ensure that all fasteners are properly tightened throughout the system (anchor bolts, etc.). Check all Fender Panels. If they do not fit tightly against the underlying panel, system realignment may be necessary (Figure 41).
QuadGuard ® Elite M10 Wide Final Inspection Checklist Site Location: ___________________________ Date: __________________________________ Inspector: ______________________________ ® Refer to the QuadGuard Elite M10 Wide manual and/or drawing package. Proper Transition Panel is used for barrier type (p. 11) If no transition is used, side panels are used with backup (p. 11) Minimum clearance of 25”...
Maintenance and Repair Important: Inspections are recommended, as needed, based upon volume of traffic and impact history. Visual Drive-By Inspections are recommended at least once a month. Walk-Up Inspections are recommended at least once a year. Visual Drive-By Inspection 1) Encountering a system with the Hit Indicator in the vertical position mandates inspection of the system.
Page 40
Note: The energy absorbing HDPE Cylinders lose their ability to absorb energy with increasing number of system impacts. After multiple full capacity design impacts, the system will no longer be able to meet the requirements as specified in MASH. To ensure that Cylinder replacement is accomplished before this condition occurs, it is essential that this part of the inspection be conducted every time the Hit Indicator indicates the system has been impacted.
Post-Impact Instructions 1) Deploy the appropriate traffic-control devices to protect your crew. Warning: An impacted system can store energy in collapsed Cylinders and may spring back unexpectedly causing serious injury. Use caution during post-impact inspections for repair or refurbishment. Warning: It is the responsibility of the worker to keep hands and other body parts clear of system interaction.
Page 43
1.0” [25 mm] (p. 43). 13) Replace all damaged Cylinders. If a Cylinder’s condition is questionable, a photo of the Cylinder may be forwarded to Trinity Highway for evaluation (p. 3). 14) Tighten and torque all fasteners on the system (p. 36).
Page 44
CAUTION: FENDER PANEL TRAFFIC MAXIMUM GAP = 1.0” [25 mm] UNDERLYING FENDER, TRANSITION, EXTENSION OR SIDE PANEL Figure 45 Fender Panel Gap Torque Specifications Warning: Mushroom Bolt Tighten nut to bolt shank Assemblies Torqued to adhesive manufacturer’s specification. Anchor Studs Shall Not Extend Above Concrete Pad More than 1 1/2”...
Parts Ordering Procedure and Drawings Make a list of all damaged parts using part descriptions illustrated on drawings in the back. Answer the following questions in the spaces provided. This information is necessary to receive the proper parts. QuadGuard Elite M10 Wide Ordering Information Chart ®...
Page 46
118092 Washer,Lock,3/8,G 118100 Washer,Lock,5/8,G 617045 Washer,Mushroom,Forged,QG,G Warning: Use only Trinity Highway parts that are specified herein for assembling, Do not utilize or ® maintaining, or repairing the QuadGuard Elite M10 Wide. otherwise comingle parts from other Trinity Highway systems Such configurations have not been tested, nor have they been deemed eligible for use.
Need help?
Do you have a question about the QuadGuard Elite M10 Wide and is the answer not in the manual?