Preparing The Machine For Operation; Installing Ejection Chute Extension; Installing Wheels And Chassis; Installing The Discharge Flap - Viking GB 370 S Instruction Manual

Hide thumbs Also See for GB 370 S:
Table of Contents

Advertisement

Item
Designation
O
Hexagon screw
M10x55
P
Retaining washer
Q
Closure screw
R
Wheel pin
S
Pin
T
Deflector
U
Upper spacing ring
V
Lower spacing ring
W
Protective cap
X
Installation tool
Y
Torx wrench
Z
Combination spanner
Instruction manual
Engine
instruction manual
7. Preparing the machine for
operation
Risk of injury:
Observe the safety instructions in
the section "For your safety" (
● Place the machine on level and firm
ground when performing all the
operations described.
7.1 Installing ejection chute
extension
● Fit ejection chute extension (E)
onto basic unit and install screws (J)
(1 - 2 Nm).
0478 216 9901 D - EN
Qty.

7.2 Installing wheels and chassis

1
● Attach left and right wheels (G)
with wheel pin (R), washer (L1),
1
washer (L2) and nut (K1) to
2
wheel carrier (C).
2
● Press wheel caps (H) onto wheels.
2
● Place wheel carrier as shown on firm
1
and level ground and fit basic unit (B)
1
into position.
1
● Insert flat head bolts (N) on the left side
1
and screw on lock nuts (K2), but do not
1
tighten them yet.
1
Install Torx screw (M) on the right side
1
(1 - 2 Nm).
1
● Tighten nuts (K2) (10 - 12 Nm).
1

7.3 Installing the discharge flap

● Set garden shredder on its back.
● Insert strip (F) into ejection chute
extension. Install screws (J) (1 - 2 Nm).
● Lift garden shredder into upright
4.).
position.
● Position discharge flap (D) on ejection
chute extension. Ensure that the ribs (1)
inside the flaps on the left and right are
correctly located in the guide groove of
the ejection chute extension (2) when
attaching.
3
● Press in pins (S) on left and right.
7.4 Opening and closing the
discharge flap
4
5
Opening the discharge flap:
● For shredding, fold the discharge
flap (D) upwards and allow the tab (1)
to engage in the ejection chute
extension.
Closing the discharge flap:
● For transport or space-saving storage,
lift the tab (1) slightly and fold away the
discharge flap (D) downwards.

7.5 Installing the blade disc

Observe the installation sequence
and tightening torque of 52 - 60 Nm
.
Ensure correct position of upper
6
spacing ring (U) to both blades
when installing.
● Fit protective cap (W), lower spacing
ring (V), blade disc (I), upper spacing
ring (U), deflector (T) and retaining
washer (P) onto blade mounting and
insert screw (O).
● Use installation tool (X) to counterhold
the blade disc. Screw in screw (O)
using combination spanner (Z) and
tighten to a torque of 52 - 60 Nm.

7.6 Removing the blade disc

● Use installation tool (X) to
counterhold the blade disc.
● Loosen screw (O) with combination
spanner (Z).
7
8
9
35

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents