BetterAir BA-1000 Setup Manual

BetterAir BA-1000 Setup Manual

Automatic air duct purifier

Advertisement

Quick Links

BA-1000 Safety Precautions:

Please read the manual carefully before installation.
1.
Disinfect straw with antibacterial swab provided.
Avoid placing in or near high temperatures (~140 degrees Fahrenheit) or in a wet environment
2.
3.
Unit must be kept in upright position. Do not lay flat or place sideways
Keep air circulating
4.
5.
Clean and maintain the system regularly.
Do not attempt to repair this machine without speaking with factory
6.
7.
Do not connect to a unsafe power supply, make sure unit is grounded
The power supply should be located out of the reach of children
8.
9.
Do not use system during lightning storm unless protected by a properly sized surge protector.
10.
Unplug power supply before cleaning or maintaining the unit
11.
Do not use dangerous or poisonous chemicals with equipment; only use hot water for cleaning.
12.
Do not sit or stand on the equipment. Do not stand under the unit during installation.
13.
Unit will not operate properly if positioned sideways or upside down. BA-008 must be installed level.
14.
The BA- 1000 Probiotic bottle should not be refilled by any liquid other than Better Air Probiotic refill supplied by
the manufacturer

Basic Set-Up

1. Plug in the power supply
2. Press the
for 5 seconds to turn on the system
3.Plug & Play- The system is ready for use

Basic Overview of Installation on HVAC systems

1) The BA-1000 unit includes a metal cabinet that can be mounted on any wall supporting 45lbs. Inside the cabinet
is an oil less air compressor, preprogrammed control system and a liquid container with our probiotic solution.
2) Once control system operates the compressor the fluid is dispersed into micron-sized droplets which enter the
air duct and are carried by the airflow through the ducts and out of the grills, delivering a safe probiotic layer into
the indoor environment.
BA-1000 Automatic Air Duct Purifier Set-up Manual

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BA-1000 and is the answer not in the manual?

Questions and answers

Summary of Contents for BetterAir BA-1000

  • Page 1 Basic Overview of Installation on HVAC systems 1) The BA-1000 unit includes a metal cabinet that can be mounted on any wall supporting 45lbs. Inside the cabinet is an oil less air compressor, preprogrammed control system and a liquid container with our probiotic solution.
  • Page 2 HVAC system install: 1. Mount the BA-1000 unit to the wall using 2 screws or place the unit near the HVAC system. The supporting wall must be able to hold a weight of up to 45lbs/20 kg. 2. Drill a hole through the air duct and insert the white plastic tube provided. Attach the transparent rubber hose to the white plastic tube and connect it to the Probiotic container.
  • Page 3 BA-1000 Programming Instructions STEP 1 - Set the duration of the program In order to set the program to run continuously for 24hrs, please make sure the duration of the program is set to 00:00 and 23:59 as indicated in figure 1.
  • Page 4 Program #2 (1 month) 1. Press the ENT button twice 2. Click on the right arrow 4 times until you reach W and P. 3. Use the Up arrow to change the values. W : 40 P : 300 (In our newest model instead of W and P you’ll find 02, you won’t need to change the actual value).
  • Page 5 Program #8 (1 week) 1. Press the ENT button twice Click on the right arrow 4 times until you reach W and P. 3. Use the Up arrow to change the values. W : 60 P : 120 (In our newest model instead of W and P you’ll find 08, you won’t need to change the actual value) 4.

Table of Contents