Download Print this page
Siemens 4MLKA1A Installation Instructions
Siemens 4MLKA1A Installation Instructions

Siemens 4MLKA1A Installation Instructions

P1-400 panelboard kit main/feed-thru lugs (for use in revised p1 panelboards only)

Advertisement

Quick Links

These instructions do not purport to cover all details or variations in equipment, or to provide for every possible
contingency to be met in connection with installation, operation or maintenance. Should further information be
desired or should particular problems arise, which are not covered sufficiently for the purchaser's purposes, the
matter should be referred to the local Siemens sales office. The contents of this Instruction manual shall not
become part of or modify any prior or existing agreement, commitment or relationship. The sales contract
contains the entire obligation of Siemens. The warranty contained in the contract between the parties is the sole
warranty of Siemens. Any statements contained herein do not create new warranties or modify the existing
warranty.
Trademarks - Unless otherwise noted, all names identified by ® are registered trademarks of Siemens AG or
Siemens Industry, Inc. The remaining trademarks in this publication may be trademarks whose use by third
parties for their own purposes could violate the rights of the owner.
-4-
s
P1-400 Panelboard Kit
4MLKA1A, 4MLKA3A
Main / Feed-thru Lugs
(for use in Revised P1 Panelboards ONLY)
1
To confirm, note the part number of the panel (marked on the interior label).
If it ends in an "N" or a "T" it is a "Revised P1" and is compatible with this kit.
(For example: P1E42MC250A is an Original P1; P1E42MC250AT is a Revised P1)
Installation
Instructions
1
11-A-1108-01 Rev. 01

Advertisement

loading

Summary of Contents for Siemens 4MLKA1A

  • Page 1 Siemens sales office. The contents of this Instruction manual shall not become part of or modify any prior or existing agreement, commitment or relationship. The sales contract contains the entire obligation of Siemens.
  • Page 2 Installation Instructions The following instructions are for the installation of Siemens main / feed-thru lug kit in a Revised P1, 400 amp, DEADFRONT Panelboard. The parts provided in this kit are for connection to a 1-phase 2 or 3-wire system OR a 3-phase 3 or 4-wire systems.

This manual is also suitable for:

4mlka3a