RESOL FlowCon B
Mounting
Installation
Operation
Commissioning
B
Manual
Thank you for buying this RESOL product. Please read this manual carefully, to get the best
www.resol.de
performance from this unit.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the FlowCon B and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Resol FlowCon B

  • Page 1 RESOL FlowCon B Mounting Installation Operation Commissioning Manual Thank you for buying this RESOL product. Please read this manual carefully, to get the best www.resol.de performance from this unit.
  • Page 2: Table Of Contents

    Hattingen, declare under our sole responsibility that our product FlowCon B complies with the following standards: This product is to be used in accordance with its intended use only (see page 3).
  • Page 3: Technical Data And Operation

    FlowCon B Prepared for integration of the • BS / BS Plus controller DeltaSol ® Dial thermometer for flow and return • Outstanding design • Return line with ball valve and openable non- • return valve Integrated flowmeter • Safety assembly with relief valve and pressure •...
  • Page 4: Installation

    FlowCon B 1. Installation Wall mounting bracket of the pump station Safety valve 6 bar Insulation - rear Optional: expansion vessel set Controller Optional: AirStopp Insulation - front cover Optional: Compression ring connection for Flowmeter copper pipe Drain valve pump...
  • Page 5: Optional Compression Ring Connection

    FlowCon B Screws S6 x 60 All connections are pre-assembled by the manufacturer but have to be tightened by the installer. Check for leaks when commissioning the station (pressure test). 1.2 Optional compression ring connection First push the union nut (2), then the brass compression ring (3) onto the copper pipe (1).
  • Page 6: Electrical Connection

    FlowCon B 1.4 Electrical connection The unit must only be located in dry interior locations. It Push the cover in front of the controller downwards in order is not suitable for installation in hazardous locations and to access the controller. Open the housing of the controller at should not be placed close to any electromagnetic fields.
  • Page 7: Commissioning

    FlowCon B 2. Commissioning 2.1 Filling, flushing and commissioning the pump station Adjust the system to the manufacturer‘s recommended · Connect the pressure hose to the fill valve at the safety pressure (to approx. 1,8 to 2,3bar with a collector head-piece below the pressure gauge (11) and open the height of approx.
  • Page 8: Non-Return Valves

    FlowCon B 2.3 Non-return valves The non-return valves of the pump station are integrated into the ball valves above the circulation pump and into the flow and have an opening pressure of 200 mm head each. In order to empty the system completely, the nonreturn valve has to be opened.
  • Page 9: Air-Stopp

    Overvoltage protection In order to avoid overvoltage damage at collector sensors (e.g. caused by local lightning storms), we recommend in- stalling the overvoltage protection RESOL SP1 . Flowmeter If you wish to carry out a heat quantity measurement, you need a flowmeter for measuring the flow rate in your...
  • Page 10 FlowCon B Notes...
  • Page 11 FlowCon B Notes...
  • Page 12: Imprint

    Another use outside the copyright requires the manualand to the best of our knowledge and consent. As approval of RESOL - Elektronische Regelungen GmbH. This faults can never be excluded, please note: especially applies for copies, translations, micro films and the Your own calculations and plans, under consideration of the storage into electronic systems.