This document details the National Electrical Code (NEC) requirements for properly grounding an ONT during installation. This document also provides specific information for installing the ground on the Calix 500- Series or 700-Series ONTs, on the following models: ONT Type...
Page 10
Calix recommends that the testing of grounds be conducted on a preventative maintenance schedule to insure the maximum safety possible. Maintenance records should be kept for each ONT installation. In some locations, extremely high earth ground resistance is present. In these locations, chemicals that lower earth resistance can be added to the earth that surrounds the electrode.