Weil-McLain GOLD GV 3 Series Manual page 8

Hide thumbs Also See for GOLD GV 3 Series:
Table of Contents

Advertisement

Finish the vent
installation
8
GOLD GV Water boiler — Series 3
Installation — assembly
Installing condensate tubing
1. See
to install condensate tubing
Figure 10
(provided by others). Use condensate pump
if floor drain is higher than condensate
drain on boiler.
If required:
use a low-profile pump — OR —
set boiler on foundation (see
) to allow gravity flow
3 Boiler Manual
to pump.
2. Size pump in gal/hr (boiler model):
0.78 (GV-3)
1.17 (GV-4)
1.56 (GV-5)
1.95 (GV-6)
Refer to pump manufacturer's instructions.
Drain to a non-freezing area.
If vent pipe or combustion air pipe must be reassembled
When vent pipe or combustion air pipe is disconnected for any reason, it must be reassembled
and resealed according to this Venting Supplement, the direct vent termination kit instructions
and the vent pipe manufacturer's instructions.
Sealant recommended by vent pipe manufacturer must be used as indicated
in their instructions. Vent and combustion air connector piping must be
sealed gas-tight to prevent possibility of flue gas spillage and carbon
monoxide emissions, resulting in severe personal injury or death.
Figure 10
Installation of condensate tubing
GV Series
5/8" O.D. tubing,
provided by
others
continued
®
Saf-T Vent
vent starter tee
27106
Weil-McLain
500 Blaine Street
Michigan City, IN 46360-2388
http://www.weil-mclain.com
Part Number 550-110-271/0699

Advertisement

Table of Contents
loading

Table of Contents