Download Print this page

Kemlan CELESTIAL 900 WITH FAN Installation & Operating Instructions Manual page 6

Advertisement

All 8"-10" assembled flues must
have the crimps pointing upwards
DETAIL A
All 6" assembled flues must have
the crimps pointing downwards
DETAIL B
Register plate with vented upstands
Minimum 600mm below ceiling.
Insul wool (supplied by installer) can
be placed on top of register plate
1 row of Hebel or brick to be used above
register plate before timber frame work is used
HEBEL BLOCKS
STD.
FASCIA
DETAIL C
20/08/2020
CELESTIAL 900 MASONRY
BLOCK CONSTRUCTION
plain
crimped
Triple skin flue system
(10", 8" and 6")
Ceiling
crimped
plain
6" Flue
9mm Fibre
cement sheet
15mm min. air gap
LINTEL
HEAT DUCTING
BOX
Flue system to be installed
to suit AS/NZS 2918.2001
A
B
C
ver.5
25mm min. clearance between
10" flue and framing
Combustible Frame
Hebel or brick construction
to the ceiling
Stainless steel flue pipe.
All flue pipes must be
connected with pop rivets
supplied by installer
Outlet air vents from chase
Hebel Block –
min. thickness – 75mm
Rear of unit to
Hebel Block – 25mm min.
Inlet air vents into chase
6

Advertisement

loading

Related Products for Kemlan CELESTIAL 900 WITH FAN