Power Consumption; Workstation Requirements; Electrical Requirements; Ac Power Requirements - Stratasys BST1200es Site Preparation Manual

Table of Contents

Advertisement

POWER CONSUMPTION

Power Consumption
(while building)

WORKSTATION REQUIREMENTS

For details, see the CatalystEX Workstation Requirements document available from the Stratasys website.

ELECTRICAL REQUIREMENTS

AC POWER REQUIREMENTS

50/60 Hz
100-240 VAC
15-7A
1200W dedicated circuit
The grounded electrical outlet must connect to either a Euro or a US power cord plug provided
and must be located within 2 m (80 inches) of the printer.
Operation of the printer outside this range is not recommended; degradation of performance and shortened
component life expectancy will be experienced.
Caution: Do not use an extension cord or power strip; doing so can result in
intermittent power issues. Connect the power cord directly into the receptacle or
UPS.

LAN REQUIREMENTS

A LAN connection is required for communication and file transfer functions.
The LAN connection is a 100 base T, Ethernet protocol, RJ45 connector. One CAT5, 10/100 base T cable is
supplied with the printer, located in the Startup Kit.
The LAN connection must be located within 4 m (14 feet) of the printer.
The printer will function in either DHCP or Static IP configurations.
Note: Printers configured with a network option of UPnP=ON will occasionally
broadcast a unique system identifier across the network for use by the Catalyst
software application.
Refer to Catalyst's user information for workstation requirements.
~1080W
3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sst1200es

Table of Contents