LG ATUQ24GNLT0 Installation Manual
Hide thumbs Also See for ATUQ24GNLT0:

Advertisement

Quick Links

INSTALLATION MANUAL
AIR
CONDITIONER
Please read this installation manual completely before installing the product.
Installation work must be performed in accordance with the national wiring
standards by authorized personnel only.
Please retain this installation manual for future reference after reading it
thoroughly.
P/NO : MFL68061217
www.lg.com

Advertisement

Table of Contents
loading

Summary of Contents for LG ATUQ24GNLT0

  • Page 1 Please read this installation manual completely before installing the product. Installation work must be performed in accordance with the national wiring standards by authorized personnel only. Please retain this installation manual for future reference after reading it thoroughly. www.lg.com P/NO : MFL68061217...
  • Page 2 TIPS FOR SAVING ENERGY TIPS FOR SAVING ENERGY Here are some tips that will help you minimize the power consumption when you use the air conditioner. You can use your air conditioner more efficiently by referring to the instructions below: •...
  • Page 3: Important Safety Instructions

    IMPORTANT SAFETY INSTRUCTIONS IMPORTANT SAFETY INSTRUCTIONS READ ALL INSTRUCTIONS BEFORE USING THE APPLIANCE. Always comply with the following precautions to avoid dangerous situations and ensure peak performance of your product WARNING It can result in serious injury or death when the directions are ignored CAUTION It can result in minor injury or product damage when the directions are ignored WARNING...
  • Page 4 IMPORTANT SAFETY INSTRUCTIONS Operation • Do not share the outlet with other appliances. It will cause an electric shock or a fire due to heat generation. • Do not use the damaged power cable. Otherwise, it may cause a fire or electrical shock. •...
  • Page 5 IMPORTANT SAFETY INSTRUCTIONS CAUTION Installation • Install the drain hose to ensure that drain can be securely done. Otherwise, it may cause water leakage. • Install the product so that the noise or hot wind from the outdoor unit may not cause any damage to the neighbors.
  • Page 6: Table Of Contents

    TABLE OF CONTENTS TABLE OF CONTENTS TIPS FOR SAVING ENER- LEAKAGE TEST AND EVACUATION Preparation IMPORTANT SAFETY Leakage test INSTRUCTIONS Evacuation INSTALLATION OF OUT- TEST RUNNING DOOR UNIT FUNCTION Night Silent Operation setting Forced Cooling Operation WIRING CONNECTION SELF-DIAGNOSIS FUNC- Electrical Wiring TION Connecting Cables between Indoor Unit...
  • Page 7: Installation Of Outdoor Unit

    More than 600 mm More than 700 mm Piping length and the elevation Ceiling Cassette Pipe Size Length A (m) Elevation B (m) Additional MODEL Refrigerant Liquid Standard Max. Standard Max. (g/m) ATUQ24GNLT0 Ø15.88(5/8) Ø9.52(3/8) ATUQ36GMLT0 Ø15.88(5/8) Ø9.52(3/8) ATUQ48GMLH0 Ø19.05(3/4) Ø9.52(3/8)
  • Page 8 INSTALLATION OF OUTDOOR UNIT Ceiling Suspended Air conditioner Pipe Size Length A (m) Elevation B (m) Additional MODEL Refrigerant Liquid Standard Max. Standard Max. (g/m) AVUQ36GM1H0 Ø15.88(5/8) Ø9.52(3/8) AVUQ48GM2H0 Ø19.05(3/4) Ø9.52(3/8) If installed tube is shorter than 15 m, additional charging is not necessary. Additional Refrigerant = (A -15) x Additional refrigerant (g) Indoor unit Outdoor unit...
  • Page 9: Night Silent Operation Setting

    INSTALLATION OF OUTDOOR UNIT Night Silent Operation setting - Open the Side panel or Top Cover of outdoor unit. - Set the SW01N. ATUQ24GNLT0 ATUQ36GMLT0 ATUQ48GMLH0 Step 1 9 10 Step 2 9 10 AVUQ36GM1H0 AVUQ48GM2HO - Close the Side panel or Top Cover.
  • Page 10: Wiring Connection

    A disconnection device to ade- quately disconnect all supply lines must be fitted. - Model of circuit breaker recommended by authorized personnel only Model Phase(Ø) ELCB ATUQ24GNLT0 25 A ATUQ36GMLT0 30 A AVUQ36GM1H0 ATUQ48GMLH0 40 A AVUQ48GM2H0...
  • Page 11: Connecting Cables Between Indoor Unit And Outdoor Unit

    The power cable connected to the outdoor unit should be complied with IEC 60245 or HD 22.4 S4 (This equipment shall be provided with a cable set complying with the national regulation. 10±3 mm Model Phase(Ø) Area(mm ATUQ24GNLT0 For the 1-Phase ATUQ36GMLT0 AVUQ36GM1H0 10±3 mm ATUQ48GMLH0...
  • Page 12 WIRING CONNECTION Precautions when laying power wiring Use round pressure terminals for connections to the power terminal block. Power wire Round pressure terminal When none are available, follow the instructions below. - Do not connect wiring of different thicknesses to the power terminal block. (Slack in the power wiring may cause abnormal heat.) - When connecting wiring which is the same thickness, do as shown in the figure below.
  • Page 13: Connecting The Cable To Outdoor Unit

    WIRING CONNECTION Connecting the cable to Outdoor Unit Remove the side panel for wiring connection. Use the cord clamp to fix the cord. Earthing work - Connect the cable of diameter more to the earthing terminal provided in the control box and do earthing.
  • Page 14: Connecting Pipes

    CONNECTING PIPES CONNECTING PIPES Preparation of Piping Main cause of gas leakage is defect in flaring work. Carry out correct flaring work in the following procedure. Cut the pipes and the cable - Use the piping kit accessory or the pipes pur- chased locally.
  • Page 15: Connecting The Pipes To The Outdoor Unit

    CONNECTING PIPES Connecting the pipes to the Outdoor unit Align the center of the piping and sufficiently tighten the flare nut by hand. Continuous Finally, tighten the flare nut with torque wrench until the wrench clicks. - When tightening the flare nut with torque Torque wrench, ensure the direction for tightening wrench...
  • Page 16 CONNECTING PIPES <Figure 2> When connecting in a downward direction, knock out the knock-out hole of the base pan. (refer to figure 2) Knock-out Base pan <Figure 3> Preventing foreign objects from entering (Figure 3) Liquid side piping - Plug the pipe through-holes with putty or insulation material(procured locally)to stop up Gas side piping all gaps,as shown in the figure 3.
  • Page 17: Forming The Piping

    CONNECTING PIPES Forming the Piping In cases where the Outdoor unit is installed above the Indoor unit perform the following. Form the piping by wrapping the connecting Tape the piping and connecting cable from portion of the indoor unit with insulation mate- down to up.
  • Page 18: Leakage Test And Evacuation

    CONNECTING PIPES LEAKAGE TEST AND EVACUATION Air and moisture remaining in the refrigerant CAUTION system have undesirable effects as indicated below. To avoid nitrogen entering the refrigerant - Pressure in the system rises. system in a liquid state, the top of the cylinder must be higher than its bottom - Operating current rises.
  • Page 19: Evacuation

    LEAKAGE TEST AND EVACUATION Evacuation - Replace the valve caps at both gas and liquid side service valves and fasten them tight. - Connect the charge hose end described in This completes air purging with a vacuum pump. the preceding steps to the vacuum pump to The air conditioner is now ready to test run.
  • Page 20: Test Running

    TEST RUNNING TEST RUNNING Precautions In Test Running - The initial power supply must provide at least 90 % of the rated voltage. Otherwise, the air conditioner should not be operated. CAUTION For test run, carry out the cooling operation firstly even during heating season. If heating operation is carried out firstly, it leads to the trouble of compressor.
  • Page 21 TEST RUNNING CAUTION After the confirmation of the above conditions, prepare the wiring as follows: Never fail to have an individual power specialized for the air conditioner. As for the method of wiring, be guided by the circuit diagram pasted on the inside of control box cover.
  • Page 22: Function

    FUNCTION FUNCTION Forced Cooling Operation (Pump down) Adding the refrigerant in winter. Setting Procedure - Set the Dip Switch as follow after shutting the power source down. ATUQ24GNLT0 ATUQ36GMLT0 ATUQ48GMLH0 9 10 AVUQ36GM1H0 AVUQ48GM2H0 - Reset the power. - Red LED and Green LED of PCB lights during work. (The indoor unit is operated by force.) - If operation is done, Red LED will be turned off.
  • Page 23: Self-Diagnosis Function

    Error Indicator (Outdoor) Outdoor Error 2 Times 2 Times 2 Times Ex) Error 21 (DC Peack) LED01G (RED) 1 Sec. 1 Sec. 1 Sec. 1 Time 1 Time 1 Time LED02G (GREEN) 2 Sec. 2 Sec. ATUQ24GNLT0 ATUQ36GMLT0 ATUQ48GMLH0 AVUQ36GM1H0 AVUQ48GM2H0...
  • Page 24 SELF-DIAGNOSIS FUNCTION LED 1 LED 2 Indoor Error Code Description (Red) (Green) status 2times ◑ 1time ◑ DC Peak(IPM Fault) 2times ◑ 2times ◑ Max. CT(CT2) 2times ◑ 3times ◑ DC Link Low Volt. 2times ◑ 4times ◑ Pressure switch/Heater Sink. 2times ◑...
  • Page 25: Installation Guide At The Seaside

    INSTALLATION GUIDE AT THE SEASIDE INSTALLATION GUIDE AT THE SEASIDE In case, to install the outdoor unit on the CAUTION seaside, set up a windbreak not to be exposed to the sea wind. • Air conditioners should not be installed in areas where corrosive gases, such as acid or alkaline gas, are produced.