Installation Instructions; Before You Begin; Electrical Requirements - GE ENERGY STAR AHC24 Series Owner's Manual & Installation Instructions

Hide thumbs Also See for ENERGY STAR AHC24 Series:
Table of Contents

Advertisement

Available languages

Available languages

Installation Instructions

Questions? Call 800.GE.CARES (800.432.2737) or Visit our Website at: GEAppliances.com

BEFORE YOU BEGIN

Read these instructions completely and
carefully.
IMPORTANT –
instructions for local inspector's use.
IMPORTANT –
governing codes and ordinances.
• Note to Installer – Be sure to leave these
instructions with the Consumer.
• Note to Consumer – Keep these instructions for
future reference.
• Skill level – Installation of this appliance
requires basic mechanical skills.
• Completion time
• We recommend that two people install this
product.
• Proper installation is the responsibility of the
installer.
• Product failure due to improper installation is not
covered under the Warranty.
installation procedures as described in these
instructions when installing this air conditioner.

ELECTRICAL REQUIREMENTS

Some models require a 115/120-volt AC,
60-Hz grounded outlet protected with a
15-amp time-delay fuse or circuit breaker.
The 3-prong grounding plug minimizes the
possibility of electric shock hazard. If the wall outlet
you plan to use is only a 2-prong outlet, it is your
responsibility to have it replaced with a properly
grounded 3-prong wall outlet.
Some models require 230/208-volt AC,
protected with a time-delay fuse or circuit
breaker. These models should be installed
on their own single branch circuit for best
performance and to prevent overloading
house or apartment wiring circuits, which
could cause a possible fire hazard from
overheating wires.
CAUTION
Do not, under any circumstances, cut or remove the
third (ground) prong from the power cord.
Do not change the plug on the power cord of this air
conditioner.
Aluminum house wiring may present special
problems—consult a qualified electrician.
8
Save these
Observe all
TOOLS YOU WILL NEED
Phillips head screwdriver
Flat-blade screwdriver
Pencil
Level
Power cord includes a current interrupter device. A
test and reset button is provided on the plug case.
The device should be tested on a periodic basis
by first pressing the TEST button and then the
RESET button while plugged into the outlet. If the
TEST button does not trip or if the RESET button
will not stay engaged, discontinue use of the
air conditioner and contact a qualified service
technician.
Ruler or tape measure
Scissors or knife
49-5000092

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Energy star ahc24dy

Table of Contents