GE ENERGY STAR AHC24 Series Owner's Manual & Installation Instructions page 15

Hide thumbs Also See for ENERGY STAR AHC24 Series:
Table of Contents

Advertisement

Available languages

Available languages

Through-the-Wall Installation Instructions—Optional
The case may be installed through-the-wall in
both existing and new construction.
Read completely, then follow step-by-step.
NOTE: Obtain all materials locally for mounting
the air conditioner through-the-wall.
1. IMPORTANT
Through-the-wall installation is not appropriate
if any of the side or top louvers in the case will
be obstructed by the wall.
All side and top louvers in the case must
project on the outdoor side of the wall.
The room side of the case must project
into the room far enough to maximize the
balance of the unit.
The case must be installed level from side-to-
side and with a slight tilt from front to rear. Use
a level; no more than a 1/2 bubble will be the
correct case slant to the outside.
Lintel angle is required to support bricks or
blocks above opening.
Flashing is required and should extend the
length of the opening to ensure no inside
cavity leakage occurs.
A.
Remove the air conditioner from the case. For
specific instruction, refer to the Window Installation
Instructions.
B.
Make certain that a wall receptacle is available
close to the hole location or make arrangements to
install a receptacle.
C
.
Place the case in the wall opening and
place wood support strips between the case
bottom and the flashing on both sides of the
bottom rail. They should be the same height as
the bottom rail and the same length as the wall
opening.
49-5000092
1. IMPORTANT
D.
Secure with 14 wood screws anchored at least an
inch into the wall support structure.
NOTE: Drill pilot holes, if necessary, for proper
installation. If the frame is oversized, use shims to
prevent case distortion.
2. FINISH THE WALL OPENING
A.
Caulk all four sides on the outdoor side of the case
to prevent moisture from getting through to the
prevent water from dripping inside the wall and
down the outside of the building.
Lintel angle
Caulking
Air louvers
(top and sides
must project
on the outdoor
side of the
wall)
Wood filler and
caulking (above
and below the
flashing)
Flashing
(Drip rail)
Flashing
(Drip rail)
B.
Place the air conditioner into the case.
For specific instruction, refer to the Window
Installation Instructions.
(cont.)
Plaster line
Trim molding (if
desired)
INSIDE
Bottom rail
Case
Bottom
bottom
rail
Wood support strips
15

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Energy star ahc24dy

Table of Contents