CONTENTS Please read surely the following precautions I. Preparation for operation -------------------------------------------------------------------------------1 1. Checking at arrival of motor -------------------------------------------------------------------------------1 2. Installation -------------------------------------------------------------------------------------------------------1 3. Electric wiring -------------------------------------------------------------------------------------------5 II. Trial operation and ordinary operation -------------------------------------------------------------------7 1. Before powering -------------------------------------------------------------------------------------------7 2. After powering -------------------------------------------------------------------------------------------7 III.
Please read surely the following precautions Introduction We thank you for your adoption of Toyo Denki ED Motor (permanent magnet type synchronous motor). This Manual shows handling method of ED motor and precautions on use for customers having general knowledge on permanent magnet type synchronous motor. Before use, please read this Manual carefully until getting of enough knowledge on our ED motor and use it when it is in optimum condition.
Page 5
! Danger ・Do not operate the motor in state that the cover of terminal box is removed. After work, fit the cover of terminal box at the original position. Otherwise, that could result in electric shock. (Piping, wiring) ・Connection with power supply cable should be done in accordance with connection diagram or Instruction Manual.
Page 6
・Repair and disassembly should be done by qualified expert. Otherwise, electric shock, injury, fire, etc. could occur. EDM Series ED motor is the most suitably designed motor for Inverter drive by Toyo Denki having high level technology in rotary machine and control equipment.
I. Preparation for operation 1. Checking at arrival of motor When the ordered motor arrived, please check paying attention to the following points. (1) Check the motor with our invoice separately sent. (2) Check the motor for damage, rusting, dropping of accessories, etc. (3) There is a case that the rotor of motor is fixed in order to prevent the bearing from being damaged during transportation.
Page 8
2.2 Connection with counterpart machine (1) Foundation work In order to minimize the vibration and misalignment during operation, strong foundation is required. If foundation is incomplete, machine will vibrate and bearing life will be shortened, to which please pay attention. The most ideal foundation in order to prevent generation of vibration is a strong concrete foundation but if such concrete foundation cannot be made because of counterpart machine and...
Page 9
(3) In case of belt drive Set the counterpart machine shaft and motor shaft accurately parallel and apply the belt in such a way that both pulley centers coincide each other. The belt is apt to be stretched too much however, excessive stretching will damage the bearing and cause unexpected accidents such as breakage of motor shaft, etc., to which please pay attention.
Page 10
Step 4 : How to find deflection (δ) ......Formula 4 Formula 4 δ= 0.016・Ls δ: Deflection (mm) Step 5 : How to find necessary force (Pk1, Pk2) for deflection (δ) ... Formula 5 Formula 5 : Necessary force (min. value) Fo + Y (min.value) = (N) for deflection (δ)
3. Electric Wiring 3.1 Terminal box There are main terminal box for motor main body terminals and thermistor, and auxiliary terminal box for electric fan. Connect external wirings correctly and firmly. Connection with pulse oscillator of motor side is connector-connection. 3.2 Connection diagram Fig.
Page 12
3.3 Direction of rotation (1) Direction of rotation must be correct. (2) Direction of rotation of the motor is expressed as seen from the shaft end of drive side. Standard direction of rotation of the motor is counterclockwise (CCW) in case that the phase sequence of power supply side is R, S, T and when these phases are connected with the motor terminal symbols U, V, W.
II. Trial operation and ordinary operation 1. Before powering All of your purchased motors from us passed severe tests at our factory however, they may have a possibility of being damaged during transportation or affected by long storage, and so carry out following checking, confirmation before starting of operation.
III. Maintenance, checking In order to prevent accidents in operation of the machine, daily monitoring or checking is required. 1. Daily checking By touching and hearing, check the vibration and sound at the time of starting and during operation of the machine and confirm that there is no abnormality. User is recommended to put the status of operation on record.
Page 15
3.2 Grease replenish type bearing For the motors of EDM43 or over, kind, quantity and interval of replenishing of grease are indicated on the name plate. (1) Replenish the grease during operation at every replenishment interval (operation time) indicated on the name plate. In case that the net operation time is short due to short-time or repetitive operation, grease should be replenished in such a way that the elapsed time including stoppage will not become twice or more of the interval indicated on the name plate, or at least every 6 months - one year.
3.4 Sound of bearing (Grease replenish type) Sound of bearing during operation is classified as follows. (1) Normal sound The normal sound is continuous one. The race sound, jarring sound and retainer sound are considered as normal. The jarring sound may be misunderstood as an abnormal noise but it does not mean the abnormality of bearing.
IV. Storage 1. Storage (1) In case that the motor is stored for 3 months or longer till the initial operation after receiving it or its operation is stopped for 3 months or longer, take the following steps. 1) Storage : The motor should be placed in the same posture with correct installation state, covered with waterproof sheet, and be kept at a dry place.
V. Disassembly, Assembly This motor incorporates permanent magnet in its rotor. Owing to this composition, pulling out of the rotor from the stator is quite difficult. Therefore, do not pull out the rotor from the stator at the time of disassembly/assembly of motor, such a case of replacement, etc. of bearing. Replacement of bearing can be carried out keeping the rotor inserted in the stator.
Page 19
(5) Loosen about 3 turns the 2 setscrews fixing the pulse oscillator rotor to the motor shaft and remove pulse oscillator. (Do not take off the setscrews.) However, an adhesive (TB1342H) is used to prevent the set screws from loosening. Before removing the set screws forcibly, warm them up to about 100°C using a thin soldering iron and then remove them.
Page 20
The shaft runout correction method is as follows. Non-magnetic (a) If the encoder mounting shaft is integral with the type dial gauge motor shaft (Refer to Fig.12 (a)), adjust by tapping the shaft end with a plastic hammer (Less than 2LB) and a rod of soft material that does not damage the shaft.
Page 21
1.2 Load side (1) Remove the bearing outer cover of load side. (For EDM22 or less, this cover is unified unit with bracket.) In addition, since the V ring is attached in the case of waterproof specification, remove the V ring. Refer to the outline drawing to identify the type of V-ring. (2) Pull out the slinger of bearing outer side of load side from the shaft.
2. Replacement of bearing 2.1 Removal of roller bearing inner ring and ball bearing (1) The pliers is used for removing the C-type snap ring and the puller for removing the Hammer slinger and bearing. (2) For the roller bearing, apply a brass or copper plate to the outer ring and alternately Plate (brass hit it at diagonal positions on the...
3. Structural drawing of motor Table 7 Name Shaft Load side double shielded ball bearing Load side bracket Stator coil Rotor Permanent magnet Stator Frame Foot Main terminal box Non-load side bearing inner cover Non-load side double shielded ball bearing Non-load side bracket Electric cooling fan Terminal box for electric...
Page 24
Table 9 Name Shaft Load side bearing outer cover Load side roller bearing (EDM35~EDM43) Load side ball bearing (EDM54) Load side bearing inner cover Load side bracket Stator coil Rotor Permanent magnet Stator Frame Main terminal box Non-load side bearing inner cover Non-load side ball bearing Non-load side bearing outer...
VI. Troubleshooting of Motor If the daily checking and periodical checking in III. Maintenance/Checking are correctly done, the motor satisfactorily works. Table 11 shows "Motor Troubleshooting" and Table 12 "Bearing Troubles and Causes". They should be referred to for daily maintenance/checking. Table 11 Motor Troubleshooting Over Phenomena...
Page 26
Table 12 Bearing Troubles and Causes Phenomena Condition Cause Remedy ① Flaking of rolling element ① Excessive interference ① Caution in assembling or making shaft/bearing housing ② Wrong selection of clearance ② Review of clearance ③ Operation clearance minus ③ Handling care in assembling ④...
VII. Industrial Product Warranty 1. Free of Charge Warranty Period The free of charge warranty period shall be “less than 1 year after installation in your company or your customers” or “less than 18 months after shipment from the factory or storage warehouse”, whichever comes first. In case of repair, overhaul or other maintenance by Toyo Denki or a company designated by Toyo Denki, the warranty period for the parts concerned shall be for 1 year from the date of acceptance inspection.
Page 28
HEAD OFFICE: Tokyo Tatemono Yaesu Bldg, 1-4-16 Yaesu, Chuo-ku, Tokyo, Japan ZIP CODE 103-0028 TEL: +81-3-5202-8133 FAX: +81-3-5202-8150 A part of specification and dimension is subject to change without notification in advance because of improvement of product, for which please understand.
Need help?
Do you have a question about the EDM Series and is the answer not in the manual?
Questions and answers