Hardware Installation - Ubiquiti AG-HP-5G23 Quick Start Manual

Airgrid m5 hp 5 ghz high-performance integrated innerfeed antenna
Hide thumbs Also See for AG-HP-5G23:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 60
English

Hardware Installation

Assemble the airGrid according to your chosen polarization.
1. Attach the L-Bracket to the Grid Reflector by sliding the tabs
into the slots.
Vertical Polarization
IMPORTANT:
match on both ends of the wireless link (horizontal to
horizontal, vertical to vertical).
2. On the front of the airGrid, ensure the polarization indicator, V
or H, properly matches your desired polarization.
Vertical Polarization
The polarization of the airGrids must
Horizontal Polarization
Horizontal Polarization
3

Advertisement

Table of Contents
loading

Table of Contents