Hardware; Unpacking; Installation - Data Display Beacon Sign User Manual

Graphics board display
Table of Contents

Advertisement

2

Hardware

2.1

Unpacking

Carefully remove the items from their package and store the packaging safely. After unpacking,
inspect the contents for any damage that may have occurred during shipment. In the event of
damage, refer to the '
2.2

Installation

The Display Board is supplied in two sections, Unit 1 and Unit 2. The Power and Serial cables from
Unit 1 to Unit 2 must be connected at installation. Refer to Figure 1 for wiring instructions. Mount the
Board securely and connect the cables as shown in the Figure below.
RS485 Box
SERIAL IN
from PC via
RS485 Box
TEMP
FUSE
110/120V AC
POWER IN
INSTALLATION INSTRUCTIONS
1.
Remove contents from Crate.
2.
Mount the Displays securely.
3.
Connect the SERIAL, TEMP, POWER and Common GROUND cables from Unit 1 to same Cables on Unit 2.
4.
Connect same color wires on POWER Terminal Blocks, i.e. Black to Black (LIVE), White to White (NEUTRAL) and
Green to Green (EARTH). Thin Black wire is Common Ground.
DDJ07850001
Technical Support'
section of this manual.
RS232 Cable
Unit 1 (Master)
Figure 2.1 – System Configuration
26-Jan-04
Control PC with GRAFIT
Graphic Board Display
32 x 96 Pixels
Warning: Do NOT power up the Display
Board until all cabling is connected.
Power Consumption for Display: 500W
Display User Manual
Software
Unit 2 (Slave)
Page 4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Great miller

Table of Contents