FLUE PASSAGEWAY AND FLUE BOX
The flue passages and flue box should be inspected
and cleaned prior to each heating season. The
sequence of operation should be as follows:
1 − Turn off both electrical and gas supply to unit.
2 − Disconnect combustion air inducer wiring.
3 − Remove screws securing flue box to unit. Remove
flue box. If necessary, remove blower assembly
from flue box. Clean flue box with wire brush.
4−
On HED-100, -125, -150, -200, -250, and -300
models, remove turbulator retention bracket and
turbulators. Clean turbulators with wire brush.
There are no turbulators on HED-75 duct heaters.
5 − Remove burners as described in Burners" section.
6 − Clean tubes with a wire brush.
7 − Reassemble unit. The combustion air and flue box
gaskets
should
also
reassembly.
8 − Restore electrical power and gas supply. Follow
lighting instructions to light unit. Check operation
of unit.
COMBUSTION AIR INDUCER
Under normal operating conditions, the combustion air
inducer should be checked and cleaned prior to the
heating season with the power supply disconnected.
Use a small brush to clean inducer wheel.
ELECTRICAL
1 − Check all wiring for loose connections.
2 − Check for correct voltage at unit (unit operating).
3 − Check amperage draw.
FLUE AND CHIMNEY
Check all vent and vent connector joints for tightness.
Ensure that connections are sealed and that there are
no blockages.
be
replaced
during
15
FAILURE TO OPERATE
If unit fails to operate check the following:
1 − Is thermostat calling for heat?
2 − Is main disconnect closed?
3 − Is there a breaker tripped or a fuse blown?
4 − Is gas turned on at meter?
5 − Is manual shutoff valve open?
6 − Is unit ignition system in lock out? If unit locks out
again, call service technician to inspect unit.
7 − Is pressure switch closed? Obstructed flue will
cause unit to shut off at pressure switch. Check
flue passage and outlet.
SAFETY SHUT−OFF VALVE TEST
The safety shut−off valve test procedure is as follows:
1 − Turn off the manual gas valve.
2 − Set the thermostat to call for heat.
3 − System begins normal sequence of operation.
4 − After approximately 30 seconds (pre purge
period) the LED will fast flash indicating the gas
valve is powered.
5 − After 10 seconds, the gas valve closes and steps
4 and 5 will repeat two additional times before
locking out the gas valve, which will be indicated
by two flashes on the LED.
6 − To restart the system, de-energize the thermostat
call for heat and follow the operating instructions
under Unit Start−Up".
REPAIR PARTS
When ordering repair parts include the complete unit
model number listed on the unit rating plate. For
example: HED−175A−1.