Advertisement

OPERATING & SERVICE PARTS MANUAL
112B FLOOR MODEL OVERWRAPPERS
Model 112B
Model 112BW
READ ALL INSTRUCTIONS CAREFULLY BEFORE OPERATING EQUIPMENT
112B MODELS:
COMPACT TWO ROLL CAPACITY
FILM CRADLE AND PACKAGE REST
COMPACT TWO ROLL CAPACITY
FILM CRADLE AND PACKAGE REST WITH SIDE WING
MODEL 112B
MODEL 112BW
2019

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 112B and is the answer not in the manual?

Questions and answers

Summary of Contents for Heat Seal 112B

  • Page 1 OPERATING & SERVICE PARTS MANUAL 112B FLOOR MODEL OVERWRAPPERS 112B MODELS: MODEL 112B COMPACT TWO ROLL CAPACITY FILM CRADLE AND PACKAGE REST MODEL 112BW COMPACT TWO ROLL CAPACITY FILM CRADLE AND PACKAGE REST WITH SIDE WING Model 112B Model 112BW...
  • Page 2: Table Of Contents

    TABLE OF CONTENTS Film Threading & Mounting ..................3 Preparing The Machine For Wrapping Packages ............4 Recommended Maintenance ..................6 Troubleshooting Guide ....................7 Electrical Diagram ......................8 Replacement Parts ......................9 Revised 2019...
  • Page 3: Film Threading & Mounting

    FILM THREADING & MOUNTING THREADING THE FILM: Thread the film as shown, if only one roll of film is being used thread it in the bottom position. Load the machine from the RIGHT SIDE Film needs to come off the roll COUNTERCLOCKWISE The film will pull itself down into the cradle...
  • Page 4: Preparing The Machine For Wrapping Packages

    PREPARING THE MACHINE FOR WRAPPING PACKAGES 1. Spread roll centering clips out to the edge of the roller. Roll centering clips 2. Position new film roll so that the film is coming off the top of the roll in a counterclockwise direction when viewed from the right side.
  • Page 5 PREPARING THE MACHINE FOR WRAPPING PACKAGES 4. The bottom film roll should be threaded through the position closest to the operator. The top film roll should be threaded through the position farthest away from the operator. Bottom film roll & position closest to operator...
  • Page 6 USING THE FILM SELECTOR Positioning the bridge for the correct film allows Bridge Channel the operator to wrap packages quicker and provides a bump to help stretch the film tightly for a more professional package look. There is a shelf-shaped channel that the bridge bar sits in.
  • Page 7: Recommended Maintenance

    RECOMMENDED MAINTENANCE * MAKE SURE TO TURN OFF THE UNIT, UNPLUG IT AND LET THE MACHINE COOL DOWN BEFORE CLEANING * FILM CUT-OFF ROD When the film cut-off rod is at room temperature it can be cleaned. Cleaning it will keep the rod clear of ...
  • Page 8 TROUBLESHOOTING OVERWRAPPERS FAQ’S If a new machine doesn’t turn on (heat Ensure that the power switch is turned on. Push the circuit up), what steps should be taken? breaker button to reset the circuit. If electricity is powering the unit, the red pilot light should be on. What is the standard voltage on this 110V wrapping machine?
  • Page 9: Electrical Diagram

    ELECTRICAL DIAGRAMS Revised 2019...
  • Page 10: Replacement Parts

    112B REPLACEMENT PARTS ITEM PART # DESCRIPTION 6106-304 Cradle Film Guide Kit 6106-305 Idle Roller Kit 6106-306 Directional Film Guide Roller Kit 6106-307 Tension Roller Kit 1872-131 Power Switch 1836-004 Power Light, Red 1824-030 Square Cutoff Rod 1815-030 1 Amp Circuit Breaker...

This manual is also suitable for:

112bw

Table of Contents