ABB TPL69-A30 Operation Manual page 91

Hide thumbs Also See for TPL69-A30:
Table of Contents

Advertisement

Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30
8 Disassembly and assembly / 8.5 Removing the cartridge group
© Copyright 2020 . All rights reserved.
Loosen and remove nuts (74027) together with washers (74018).
u
Remove six studs (74026 / 74029) in the upper section and fit four
u
guide studs (90320).
Leave two holes free for lifting device (90190).
u
Using press-off screws (90900), press off the compressor casing in-
u
ternal part (76000) until the lifting device (90190) with shackle
(90195) can be attached and secured to the crane.
Slightly lift compressor casing internal part complete with wall insert
u
and diffuser, remove guide studs (90320) and then withdraw.
Fit support angle (90025).
u
Set down compressor casing internal part complete with wall insert
u
and diffuser onto support angle and underlay.
Remove the O-ring (76040).
u
HZTL2481_EN
Rev.D
March 2020

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ht845369

Table of Contents