2.4 Operation

Switching sequence / Automatic
Open / Delayed transition
The switching sequence can be summarized in the following steps:
1.
An anomaly occurs on SOURCE 1
2.
Override momentary S1 outage delay
3.
Generator start
4.
SOURCE 2 OK
5.
Transfer from S1 to S2 delay
6.
Pre-transfer signal on
7.
Load shed signal on
8.
Pre-transfer S1 to S2 delay
9.
Load shed delay
10. Transfer switch (SOURCE 1) to position O
11. Center-off delay (only with Delayed transition I - O - II type)
12. Transfer switch (SOURCE 2) to position II
13. Post-transfer S1 to S2 delay
14. Pre-transfer signal off
The re-transfer sequency can be summarized in the following steps:
1.
SOURCE 1 is restored
2.
Transfer from S2 to S1 delay
3.
Pre-transfer signal on
4.
Pre-transfer S2 to S1 delay
5.
Transfer switch (SOURCE 2) to position O
6.
Center-off delay (only with Delayed transition I - O - II type)
7.
Transfer switch (SOURCE 1) to position I
8.
Load shed signal off
9.
Generator stop delay
10. Post-transfer S2 to S1 delay
11. Pre-transfer signal off
12. Generator stop
13. SOURCE 2 off
O P E R AT I O N , M A I N T E N A N C E , A N D I N S TA L L AT I O N G U I D E
15