HERA MOLELINE Series Installation Manual

Advertisement

• Mains power must be switched off before installing products.
• The connection, installation, commissioning and assembly operations of the products
must be performed by qualified technicians.
• Do not install wet, deformed or defective products and equipments,
do not provide power, please contact the nearest technical service.
• Install the products only in accordance with the connection patterns specified
in the relevant Specificiation Sheet.
• Do not open or attempt to repair the products and connection equipments.

Packing Contents

1 pcs.
Moleline®Series

Installation

Ground Construction

All installation procedures, including installation of the products, should be carried out by authorized technicians.
Installation of products in areas with constant fluid flow should be avoided.
Do not engage in installation applications other than the installation method specified in the manual.
Do not block the water drain channels in the products. Be careful during assembly.
When creating the product holder well, consider the environmental infrastructure.
Do not build Holder well on infrastructure like electricity, water, natural gas.
Moleline Series is suitable for inground use when the conditions specified in the manual are created.
1
Moleline®Series Holder
x
• Do not open extra holes on products for mounting and protect products from impacts.
• Do not install the products except as described below.
• Different installation of products may cause products to malfunction or hazardous conditions.
• Use recommended mounting equipments for products.
• This product is not suitable for indoor use. Electric shock may pose a risk of fire or combustion.
• Please follow the steps below when installing the products
.
1 pcs.
MOLELINE SERIES
1 pcs.
Allen Key
Installation Guide
R
Installation Guide

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MOLELINE Series and is the answer not in the manual?

Questions and answers

Summary of Contents for HERA MOLELINE Series

  • Page 1 When creating the product holder well, consider the environmental infrastructure. • Do not build Holder well on infrastructure like electricity, water, natural gas. • Moleline Series is suitable for inground use when the conditions specified in the manual are created. •...
  • Page 2 MOLELINE SERIES Installation Guide Gravel should be laid on the floor to prevent overflowing To test the water drain, place a some water should and realize water discharge for holder area. be poured. 15 minutes should be waited to see the water mixes with the artesian well.
  • Page 3 MOLELINE SERIES Installation Guide Wait for the concrete is freezing. The holder should be The holder should be installed to all prepared floor stayed remain and protected for external factors. drainage indicated in the figure. Before placing the product on the fixed Holder, the Place the product in its holder and press lightly.
  • Page 4 MOLELINE SERIES Installation Guide Connection All installation procedures, including installation of the products, should be carried out by authorized technicians. • Installation of product areas should be avoided in with constant fluid flow. • Installation ground should be avoided on soft soil, clay, sand etc.
  • Page 5 MOLELINE SERIES Installation Guide • The electrical conductor must be absolutely closed during the installation and uninstallation processes. Uninstall Turn the screw in the up direction with the hex key The product will rise up to a certain distance from the holder.

This manual is also suitable for:

Moleline s12Moleline m6

Table of Contents