15. Open the cold-water isolation valve.
10.6

Draining the product

1.
Close the service valves of the product.
2.
Start the check programme P.06 (diverter valve mid-
position).
3.
Open the drain valves.
4.
Make sure that the cap of the automatic air vent on
the internal pump is open so that the product can be
drained fully.
10.7
Checking the pre-charge pressure for the
internal expansion vessel
1.
Close the service valves and drain the product.
2.
Measure the pre-charge pressure of the expansion ves-
sel at the vessel valve.
Conditions: Pre-charge pressure < 0.075 MPa (0.75 bar)
Ideally, you should top up the expansion vessel with
nitrogen. Otherwise, top it up with air. Ensure that the
drain valve is open when topping up.
3.
If water escapes from the valve of the expansion
vessel, you must replace the expansion vessel
(→ Page 25).
4.
Fill the heating installation. (→ Page 18)
5.
Purge the heating installation. (→ Page 18)
10.8
Completing inspection and maintenance
work
Check the gas flow pressure. (→ Page 19)
Check the CO₂ content. (→ Page 20)
If required, reset the maintenance interval. (→ Page 21)
Install the front casing.
10.9

Checking the product for leak-tightness

Check that the product is leak-tight. (→ Page 20)

11 Decommissioning

11.1

Temporarily decommissioning the product

Press the on/off button.
The display goes out.
Close the gas isolator cock.
For products with hot water generation and products with
a connected domestic hot water cylinder, you must also
close the cold water stop valve.
0020189875_01 ecoTEC exclusive Installation and maintenance instructions
Decommissioning 11
11.2

Decommissioning the product

Press the on/off button.
The display goes out.
Disconnect the product from the power mains.
Close the gas isolator cock.
Close the cold water stop valve.
Drain the product. (→ Page 29)

12 Recycling and disposal

Disposing of the packaging
Dispose of the packaging correctly.
Observe all relevant regulations.

13 Customer service

Auftragsannahme Vaillant Kundendienst: 021 91 5767901